Bradford-White Corp MI30S, CX), M1XR403S*FCX, MI50L, MI504S, MI60T, MI40T ECO Energy Cut Off Testing

Page 14

SERVICE PROCEDURE RG-V

Combination Thermostat/Gas Valve Testing

and Replacement

ECO (Energy Cut Off) TESTING

Step 1. Disconnect thermocouple from combination thermostat/gas valve.

Step 2. Using a multimeter capable of measuring Ohms (or continuity), attach one lead (alligator clip) to the pilot tube. Insert the other lead (probe) fully into the magnet opening, Be sure the probe makes contact only at the top center of the magnet opening. Do not allow the probe to make contact with the threaded sides of the opening.

Step 3. If continuity is indicated, the ECO is OK. If continuity is not indicated, the ECO has opened and the combination thermostat/gas valve must be replaced.

COMBINATION THERMOSTAT/GAS VALVE REPLACEMENT

Step 1. Rotate knob of the combination thermostat/gas valve to the “OFF” position.

Step 2. Turn off gas supply to water heater.

For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position.

Step 3. Disconnect gas supply line from combination thermostat/gas valve.

Step 4. Turn off water supply and drain water heater completely.

Step 5. Remove outer jacket burner access door.

Step 6. Right side inner door removal.

For Robertshaw Control, rotate knob clockwise to the “OFF” position.

a)Disconnect resettable thermal switch wire leads (leading from combination thermostat/gas valve) and remove wire tie from feedline.

b)Remove (2) 1/4" hex drive screws from right side inner door.

c)Remove (2) 1/4" drive screws from flange section of inner door.

d)Remove right side inner door and set aside. Be careful not to damage gasket material on inner door.

Remove

Resettable Thermal Switch

Wire Tie

Wire Connection

¼" Hex Drive Screws shown on Right Side Inner Door.

¼" Hex Drive Screws at

Flange section of Inner Door

15

Image 14
Contents MI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX MI30T*FBN,CX M430T*FBN,CXMI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CX Table of Contents Bradford White Defender Safety System IntroductionTroubleshooting Chart Flammable Vapor Ignition Resistant Water HeatersFollowed exactly, a fire or explosion may result causing Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure If the information in these instructions is notInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing White Rodgers Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing Robertshaw ControlOpen Circuit Thermocouple Testing Thermocouple ReplacementService Procedure RG-III Pilot Assembly Inspection, Cleaning and ReplacementPiezo IGNITER, Electrode Testing and Replacement Service Procedure RG-IVPiezo Igniter, Electrode Testing and Replacement Combination Thermostat/Gas Valve Testing and Replacement Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Line PressureMagnet Assembly Testing Robertshaw Control Thermocouple TestingMagnet Assembly Testing White Rodgers Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Personal injury or death Explosion causing property damageSeal breach may result in a fire or Cast Iron Burner Adjustment Service Procedure RG-VIMain Burner Inspection, Adjustment Cleaning and Replacement Feedline Burner Cleaning Resettable Thermal Switch Continuity Testing Service Procedure RG-VIIResetting Thermal Switch Testing and Replacement Resettable Thermal Switch Replacement Over Tighten ScrewsScreenLok Flame Arrestor Cleaning Service Procedure RG-VIIIScreenLok Flame Arrestor Cleaning DIP Tube Inspection and Replacement Service Procedure RG-IXDip Tube and Anode Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb