SERVICE PROCEDURE RG-III
Pilot Assembly Inspection, Cleaning and Replacement
PILOT/ELECTRODE ASSEMBLY INSPECTION, CLEANING AND REPLACEMENT
Step 1. Turn off gas supply to water heater. Rotate knob
of combination thermostat/gas valve to “OFF” position.
Step 2. Remove outer jacket door.
Step 3. Remove right side of inner door per SERVICE PROCEDURE
For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position.
For Robertshaw Control, rotate knob clockwise to the “OFF” position.
Step 4 Disconnect thermocouple (3/8" wrench), pilot tube (7/16" wrench), and feedline (¾" wench) from combination thermostat/gas valve.
NOTE: Feedline nut for natural gas control
uses right hand threads, LP control uses left hand thread.
Step 5 Disconnect piezo ignition wire from piezo igniter.
Step 6. Remove burner assembly from combustion chamber.
Step 7. Remove pilot/electrode assembly from feedline (¼" drive tool)
Step 8. Inspect pilot for the following:
a)Primary air openings for blockage. Must be free from any debris (dirt, lint, etc).
| b) Kinks or cracks in the pilot tube. If found, | Primary Air |
| the pilot must be replaced. | Opening |
Step 9. | Inspect pilot orifice: |
|
a)Remove ½" nut from bottom of pilot assembly.
b)Remove pilot tube and pilot orifice.
c)inspect pilot orifice for blockage, must be cleaned or replaced.
Step 10. Install pilot/electrode assembly to feedline, secure with screw from step 7.
Feedline
Nut
Pilot Orifice
Step 11.
Step 12. Install inner door per SERVICE PROCEDURE
Step 13. To resume operation follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.
11