Bradford-White Corp M460T Thermocouple Testing, Magnet Assembly Testing White Rodgers Control

Page 13

SERVICE PROCEDURE RG-V

Combination Thermostat/Gas Valve Testing

and Replacement

THERMOCOUPLE TESTING

See SERVICE PROCEDURE RG-II

MAGNET ASSEMBLY TESTING (White Rodgers Control)

Step 1. Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for

three minuets. If the pilot will not stay lit, hold the pilot button (located on the combination thermostat/gas valve) down during this test

Step 2. Using a multimeter capable of measuring millivolts, connect one lead

using an alligator clip to the copper sheath of the thermocouple, use the second lead of the multi meter to probe the top terminal located at the back of the combination thermostat/gas valve.

Probe top terminal on back of combination

thermostat/gas valve

Alligator clip to copper sheath of thermocouple

Step 6. With a meter reading of 13 millivolts or greater, rotate knob of combination thermostat/gas valve to the “OFF” position.

Step 7. The magnet should remain closed for a drop of at least 6 millivolts. You will here a “snap” or “click” sound

when the magnet opens, if you hear this sound prior to a drop of 6 millivolts, the magnet is out of specification and the combination thermostat/gas valve should be replaced.

MAGNET ASSEMBLY TESTING (Robertshaw Control)

Step 1. Disconnect thermocouple from combination thermostat/gas valve.

Step 2. Connect a thermocouple adaptor

(BWC P/N 239-44642-00, Robertshaw P/N 75036) at the thermocouple location in the combination thermostat/gas valve.

Step 3. Reconnect thermocouple to adaptor. Make certain all connections are tight (finger tight plus ¼ turn).

Step 4 Using a multimeter capable of measuring millivolts, connect one alligator clip to the set screw of the adaptor and the other alligator clip to copper portion of the thermocouple.

Step 5. Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for three minuets.

Step 6. With a meter reading of 13 millivolts or greater, rotate knob of combination thermostat/gas valve to the “OFF” position.

Step 7. The magnet should remain closed for a drop of at least 6 millivolts. You will here a “snap” or “click” sound

when the magnet opens, if you hear this sound prior to a drop of 6 millivolts, the magnet is out of specification and the combination thermostat/gas valve should be replaced.

14

Image 13
Contents MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CX MI30T*FBN,CX M430T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Introduction Bradford White Defender Safety SystemFlammable Vapor Ignition Resistant Water Heaters Troubleshooting ChartProceed to Inner Door Gasket Replacement Procedure Service Procedure RG-IFollowed exactly, a fire or explosion may result causing If the information in these instructions is notInstallation of Inner Door With Gasket Replace outer jacket burner access door Thermocouple Testing and Replacement Service Procedure RG-IIClosed Circuit Thermocouple Testing White Rodgers Control Closed Circuit Thermocouple Testing Robertshaw ControlThermocouple Replacement Open Circuit Thermocouple TestingPilot Assembly Inspection, Cleaning and Replacement Service Procedure RG-IIIPiezo Igniter, Electrode Testing and Replacement Service Procedure RG-IVPiezo IGNITER, Electrode Testing and Replacement Combination Thermostat/Gas Valve Testing Replacement Service Procedure RG-VCombination Thermostat/Gas Valve Testing and Replacement Line PressureMagnet Assembly Testing White Rodgers Control Thermocouple TestingMagnet Assembly Testing Robertshaw Control Combination THERMOSTAT/GAS Valve Replacement ECO Energy Cut Off TestingWrench Boss Seal breach may result in a fire or Explosion causing property damagePersonal injury or death Main Burner Inspection, Adjustment Cleaning and Replacement Service Procedure RG-VICast Iron Burner Adjustment Feedline Burner Cleaning Resetting Thermal Switch Testing and Replacement Service Procedure RG-VIIResettable Thermal Switch Continuity Testing Over Tighten Screws Resettable Thermal Switch ReplacementScreenLok Flame Arrestor Cleaning Service Procedure RG-VIIIScreenLok Flame Arrestor Cleaning Dip Tube and Anode Inspection and Replacement Service Procedure RG-IXDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb