Bradford-White Corp MI404T, CX), M1XR403S*FCX, MI50L, MI504S Installation of Inner Door With Gasket

Page 6

SERVICE PROCEDURE RG-I

Inner Door/Gasket Removal, Inspection

Replacement and Reinstallation

Installation of Inner Door With Gasket.

Step 7. Clean any residual gasket residue or other debris from combustion chamber surface before installing the inner door/gasket assembly.

Step 8. Place the left side inner door into position first. Firmly position the radiused channel of the inner door aroundthe feedline. Using the 1/4” hex drive screws from step 3d, secure left side inner door in place. DO NOT OVER TIGHTEN SCREWS.

Step 9 Position thermocouple, pilot tube and Piezo wire against left side inner door flange gasket.

DO NOT ROUTE THROUGH RADIUSED CHANNEL WITH FEEDLINE.

WARNING

Stripped fastener connections may allow

for seal breach of inner door. A seal breach may result in a fire or explosion causing property damage, personal injury or death. Do not over tighten screws in steps 8, 10 and 11.

If a fastener connection is stripped, contact the manufacturer listed on the water heater rating plate.

Position thermocouple, pilot tube and piezo wire.

Radiused Channel

for Feedline

7

Image 6
Contents MI30T*FBN,CX M430T*FBN,CX MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Bradford White Defender Safety System IntroductionTroubleshooting Chart Flammable Vapor Ignition Resistant Water HeatersFollowed exactly, a fire or explosion may result causing Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure If the information in these instructions is notInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing White Rodgers Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing Robertshaw ControlOpen Circuit Thermocouple Testing Thermocouple ReplacementService Procedure RG-III Pilot Assembly Inspection, Cleaning and ReplacementService Procedure RG-IV Piezo Igniter, Electrode Testing and ReplacementPiezo IGNITER, Electrode Testing and Replacement Combination Thermostat/Gas Valve Testing and Replacement Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Line PressureThermocouple Testing Magnet Assembly Testing White Rodgers ControlMagnet Assembly Testing Robertshaw Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Explosion causing property damage Seal breach may result in a fire orPersonal injury or death Service Procedure RG-VI Main Burner Inspection, Adjustment Cleaning and ReplacementCast Iron Burner Adjustment Feedline Burner Cleaning Service Procedure RG-VII Resetting Thermal Switch Testing and ReplacementResettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsService Procedure RG-VIII ScreenLok Flame Arrestor CleaningScreenLok Flame Arrestor Cleaning Service Procedure RG-IX Dip Tube and Anode Inspection and ReplacementDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb