Bradford-White Corp M2C504T, CX), M1XR403S*FCX, MI50L, MI504S, MI60T, MI40T, MI404T, MI30T Feedline

Page 18

SERVICE PROCEDURE RG-VI

Burner Operation Inspection, Adjustment

Cleaning and Replacement

MAIN BURNER: Inspection, Adjustment,

Cleaning and Replacement (cont.)

Step 3. Fully inspect inner gasket per SERVICE PROCEDURE RG-I, step 4. Replace gasket if required following SERVICE PROCEDURE I, steps 5 & 6.

Step 4. Be certain that thermocouple, pilot tube and piezo wire are routed by inner door flange as shown and Reinstall inner door per SERVICE PROCEDURE RG-I, step 10 and 11.

Position thermocouple, pilot tube and Piezo wire.

Step 5. Observe burner operation through sight glass of inner door. Burner should operate as adjusted in step 2, if not, repeat procedure compensating air shutter position for proper burner operation with inner door in place.

Step 6. It may be necessary to clean main burner or main burner orifice to achieve proper burner operation. If cleaning is required proceed to burner cleaning section in this procedure.

BURNER CLEANING (Steel & Cast Iron)

Step 1. Remove inner door assembly per SERVICE PROCEDURE RG-I, steps 1 through 3c.

Step 2. Disconnect main burner feed line (¾ wrench), pilot tube (7/16 wrench) and thermocouple (3/8) wrench from combination thermostat gas valve and remove burner assembly from combustion chamber.

NOTE: Feedline nut for natural gas control uses right hand threads,

LP control uses left hand thread.

Step 3. Thoroughly inspect burner surface area and burner ports and remove any loose debris accumulation.

Burner Surface Area

Burner Port Area

Step 4. On cast iron burners, inspect

Burner Venturi

for any debris build up insideOpening burner venturi. If found,

disconnect feedline from burner and remove debris build up.

Feedline

19

Image 18
Contents MI30T*FBN,CX M430T*FBN,CX MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Bradford White Defender Safety System IntroductionTroubleshooting Chart Flammable Vapor Ignition Resistant Water HeatersFollowed exactly, a fire or explosion may result causing Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure If the information in these instructions is notInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing White Rodgers Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing Robertshaw ControlOpen Circuit Thermocouple Testing Thermocouple ReplacementService Procedure RG-III Pilot Assembly Inspection, Cleaning and ReplacementService Procedure RG-IV Piezo Igniter, Electrode Testing and ReplacementPiezo IGNITER, Electrode Testing and Replacement Combination Thermostat/Gas Valve Testing and Replacement Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Line PressureThermocouple Testing Magnet Assembly Testing White Rodgers ControlMagnet Assembly Testing Robertshaw Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Explosion causing property damage Seal breach may result in a fire orPersonal injury or death Service Procedure RG-VI Main Burner Inspection, Adjustment Cleaning and ReplacementCast Iron Burner Adjustment Feedline Burner Cleaning Service Procedure RG-VII Resetting Thermal Switch Testing and ReplacementResettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsService Procedure RG-VIII ScreenLok Flame Arrestor CleaningScreenLok Flame Arrestor Cleaning Service Procedure RG-IX Dip Tube and Anode Inspection and ReplacementDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb