Bradford-White Corp MI403S, CX), M1XR403S*FCX, MI50L, MI504S, MI60T, MI40T, MI404T Burner Cleaning

Page 19

SERVICE PROCEDURE RG-VI

Burner Operation Inspection, Adjustment

Cleaning and Replacement

BURNER CLEANING (Cont.)

Step 5. Disconnect (unscrew) Main burner (stamped steel “B” burner) from main burner orifice or on cast iron burners (“C” burner), loosen air shutter & disconnect (unscrew) feedline from burner.

Step 6. Remove main burner orifice from feed line (½” wrench on steel burner, 3/8" wrench on cast iron). Inspect and clean if necessary.

Step 7. Remove pilot assembly, refer to SERVICE PROCEDURE RG-III for cleaning and inspection.

Step 8. Reassemble burner.

Step 9. Inspect combustion chamber area of heater prior to reinstallation of burner assembly. If cleaning is required, refer to SERVICE PROCEDURE RG-VIII.

Step 10. Reinstall burner assembly into combustion chamber, reconnect feedline, thermocouple and pilot tube to the combination thermostat/gas valve.

Step 11. Reinstall inner door per SERVICE PROCEDURE RG-I, steps 4 through 13.

Step 12. To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

20

Image 19
Contents MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CX MI30T*FBN,CX M430T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Introduction Bradford White Defender Safety SystemFlammable Vapor Ignition Resistant Water Heaters Troubleshooting ChartIf the information in these instructions is not Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure Followed exactly, a fire or explosion may result causingInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing Robertshaw Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing White Rodgers ControlThermocouple Replacement Open Circuit Thermocouple TestingPilot Assembly Inspection, Cleaning and Replacement Service Procedure RG-IIIPiezo Igniter, Electrode Testing and Replacement Service Procedure RG-IVPiezo IGNITER, Electrode Testing and Replacement Line Pressure Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Combination Thermostat/Gas Valve Testing and ReplacementMagnet Assembly Testing White Rodgers Control Thermocouple TestingMagnet Assembly Testing Robertshaw Control Combination THERMOSTAT/GAS Valve Replacement ECO Energy Cut Off TestingWrench Boss Seal breach may result in a fire or Explosion causing property damagePersonal injury or death Main Burner Inspection, Adjustment Cleaning and Replacement Service Procedure RG-VICast Iron Burner Adjustment Feedline Burner Cleaning Resetting Thermal Switch Testing and Replacement Service Procedure RG-VIIResettable Thermal Switch Continuity Testing Over Tighten Screws Resettable Thermal Switch ReplacementScreenLok Flame Arrestor Cleaning Service Procedure RG-VIIIScreenLok Flame Arrestor Cleaning Dip Tube and Anode Inspection and Replacement Service Procedure RG-IXDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb