Bradford-White Corp 50T65F, CX) Service Procedure RG-VIII, ScreenLok Flame Arrestor Cleaning

Page 22

SERVICE PROCEDURE RG-VIII

ScreenLok® Flame Arrestor Cleaning

ScreenLok® Flame Arrestor Cleaning

Step 1. Rotate knob of combination thermostat gas valve to the off position.

For White Rodgers Control, depress knob slightly and rotate clockwise to the “OFF” position.

For Robertshaw Control, rotate knob clockwise to the “OFF” position.

Step 2. Remove outer jacket door.

Step 3. Remove inner door per SERVICE PROCEDURE RG-I, step 3a through 3e.

Step 4. Disconnect main burner feed line (¾ wrench), pilot tube (7/16 wrench) and thermocouple (3/8) wrench from combination thermostat gas valve and remove burner assembly from combustion chamber.

NOTE: Feedline nut for natural gas control uses right hand threads, LP control uses left hand thread.

Feedline

Nut

Step 5. Clean ScreenLok® Flame Arrestor using stiff brush, compressed air and/or shop vacuum to remove any scale or other debris accumulation. Using a soft brush, clear jacket openings of any dirt, dust, restrictions or other obstructions.

Step 6. Remove any debris from burner assembly per SERVICE PROCEDURE RG-V and reinstall burner assembly into combustion chamber.

Step 7. Reconnect feedline, thermocouple and pilot tube to the combination thermostat/gas valve. Step 8 Reinstall inner door per SERVICE PROCEDURE RG-I, steps 4 through 13.

Step 9. To resume operation follow the instructions located on the lighting instruction label or the lighting instruction located in the installation and operation manual.

23

Image 22
Contents MI50L*FBN,CX M1XR403S*FBN,CX MI504S*FBN,CX M1XR504T*FBN,CX MI30T*FBN,CX M430T*FBN,CXMI60T*FBN,CX M2XR504T*FBN,CX M2C504T*FBN,CX 50T65FBN,CX Table of Contents Bradford White Defender Safety System IntroductionTroubleshooting Chart Flammable Vapor Ignition Resistant Water HeatersFollowed exactly, a fire or explosion may result causing Service Procedure RG-IProceed to Inner Door Gasket Replacement Procedure If the information in these instructions is notInstallation of Inner Door With Gasket Replace outer jacket burner access door Closed Circuit Thermocouple Testing White Rodgers Control Service Procedure RG-IIThermocouple Testing and Replacement Closed Circuit Thermocouple Testing Robertshaw ControlOpen Circuit Thermocouple Testing Thermocouple ReplacementService Procedure RG-III Pilot Assembly Inspection, Cleaning and ReplacementPiezo Igniter, Electrode Testing and Replacement Service Procedure RG-IVPiezo IGNITER, Electrode Testing and Replacement Combination Thermostat/Gas Valve Testing and Replacement Service Procedure RG-VCombination Thermostat/Gas Valve Testing Replacement Line PressureMagnet Assembly Testing White Rodgers Control Thermocouple TestingMagnet Assembly Testing Robertshaw Control ECO Energy Cut Off Testing Combination THERMOSTAT/GAS Valve ReplacementWrench Boss Seal breach may result in a fire or Explosion causing property damagePersonal injury or death Main Burner Inspection, Adjustment Cleaning and Replacement Service Procedure RG-VICast Iron Burner Adjustment Feedline Burner Cleaning Resetting Thermal Switch Testing and Replacement Service Procedure RG-VIIResettable Thermal Switch Continuity Testing Resettable Thermal Switch Replacement Over Tighten ScrewsScreenLok Flame Arrestor Cleaning Service Procedure RG-VIIIScreenLok Flame Arrestor Cleaning Dip Tube and Anode Inspection and Replacement Service Procedure RG-IXDIP Tube Inspection and Replacement Anode Inspection and Replacement Parts List Page Page Fax/215-641-1612
Related manuals
Manual 40 pages 36.32 Kb