1
1.4Target groups
1.5Maintenance
1.6Forms of notation
Introduction | gis |
|
Furthermore, the installation must comply with the manufacturer's instructions.
Note
Later amendments and/or additions to all regulations, requirements and guidelines published on or prior to the moment of installing, will apply to the installation.
The three target groups for this manual are:
•(end) users;
•installation engineers;
•service and maintenance engineers.
Symbols on each page indicate the target groups for whom the information is intended. See the table.
Target group symbols
Symbol | Target group |
|
|
| (End) user |
|
|
| Installation engineer |
|
|
| Service and maintenance engineer |
|
|
A service should be carried out at least once a year, both on the water side and on the gas side. Maintenance frequency depends, among other things, on the water quality, the average burning time per day and the set water temperature.
Note
To determine the correct maintenance frequency, it is recommended to arrange for the service and maintenance engineer to check the appliance on both the water and gas side within three months following installation. Based on this check, the best maintenance frequency can be determined.
Note
Regular maintenance extends the service life of the appliance.
Note
Both the end user and the service and maintenance engineer are responsible for regular maintenance. They will need to establish clear agreements on this.
Note
If the appliance is not regularly maintained, the warranty will become void.
The following notation is used in this manual:
Note
Important information.
Caution
Ignoring this information can lead to the appliance being damaged.
Warning
Failure to carefully read this information may lead to personal injury and serious damage to the appliance.
10 | Instruction manual SGE |