5
Filling
gis
Legend | 11. service stop valve (recommended) 38. solar heating system pump station | |||
Only applicable numbers are | 12. temperature gauge | (modulating - mandatory) | ||
mentioned. | (recommended) | A. cold water supply | ||
1. | 13. condensation drainage | B. hot water supply | ||
| (mandatory if the mains water | (mandatory) | C. circulation pipe | |
| pressure exceeds 8 bar) | 14. hot water | D. gas supply | |
3. | T&P valve (mandatory) | 15. expansion valve (mandatory) | E. overflow pipe | |
4. | stop valve (recommended in pipe C 16. expansion vessel (mandatory) | F. heat exchanger supply | ||
5. | and mandatory in pipe A) | 17. | G. heat exchanger return | |
(recommended) | H. overflow safety | |||
6. | circulation pump (optional) | 18. water tank | ||
S1.collector sensor (mandatory) | ||||
9. | drain valve (mandatory) | 19. float valve | ||
S2.tank sensor (mandatory) | ||||
10. manual gas valve (mandatory) | 23. pressure valve (mandatory) | |||
S4.heat exchanger discharge sensor | ||||
20. pressure valve (mandatory) | 37. combined Q/T sensor (optional) | |||
(optional) |
26. air bleed (mandatory)
5.1Filling the appliance
5.1.1Filling unvented installations
To fill the appliance, proceed as follows:
1.Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4)for the circulation pump (6).
2.Close the drain valve (9).
3.Open the nearest hot water
4.Open the stop valve (4) on the cold water side (A) so that cold water flows into the appliance.
5.Completely fill the appliance. When a full water jet flows from the nearest
6.Bleed the entire installation of air, for example by opening all
7.The appliance is now under water supply pressure. There should be no water coming out of the expansion valve (15), nor the T&P valve (3). If this does happen, the cause might be:
- The water supply pressure is greater than the specified 8 bar. Rectify this by fitting a pressure reducing valve (1).
- The expansion valve in the protected cold supply setup is defective or incorrectly fitted.
5.1.2Filling vented installations
To fill the appliance, proceed as follows:
1.Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4)for the circulation pump (6).
2.Close the drain valve (9).
3.Open the nearest hot water
4.Open the stop valve (4) on the cold water side (A) so that cold water flows into the appliance.
5.Completely fill the appliance. When a full water jet flows from the nearest
6.Bleed the entire installation of air, for example by opening all
7.The appliance is now under water supply pressure. There should be no water coming out of the T&P valve (3). If this does happen, the T&P valve might be defective or incorrectly fitted.
50 | Instruction manual SGE |