GTO SL-1000, SL-2000 installation manual Control Board Settings, Right

Page 23
SEQ1
SEQ2
PULL/PUSH
SNGL/DUAL
DIP switches

CONTROL BOARD SETTINGS

DIP SWITCHES

The four DIP switches on the control board match the operator with the type of gate on which it is mounted. For example, gates may open right to left or left to right. Prior to packaging, the GTO/PRO SL-1000 and SL- 2000 series control board was configured for a single slide gate that opens right to left. If your gate type matches this configuration, you DO NOT need to adjust the DIP switches. Proceed to the Potentiometers section on the next page. NOTE: The direction a gate opens is determined by standing inside the property and facing toward the gate.

NOTE: To change the DIP switch settings, you must turn the control box power switch OFF; move the switch; then turn the power back ON. Use a small screwdriver to move the switches.

PULL/PUSH: Set to PULL for slide gates that open RIGHT to

LEFT [factory setting]; PUSH for slide gates that open LEFT to

RIGHT.

SNGL/DUAL: Set to SNGL for a single gate leaf [factory setting]; ON DUAL for dual gate leaves.

SEQ1: Controls the opening order of dual gate leaves. See Setting the Control Board for Dual Gate Operator Installation on page 37 for more information. (the factory setting is OFF).

SEQ2: Controls the opening order of dual gate leaves. See Setting

the Control Board for Dual Gate Operator Installation on page 37 for more information

(the factory setting is OFF).

1 2 3 4

OBSTRUCT

 

SENS.

MIN

MAX

LEARN

PWR

.

SW

.

 

 

 

 

 

 

 

 

+

BATT

 

18VAC

SOLAR

RED BLK

ORG BLU GRN CLS

OPN

RED BLK

ORG BLU

GRN

CLSEDG

OPNEDG

+

 

 

 

 

 

 

 

 

~

~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SECOND

 

 

 

 

 

 

 

FIRST

OPERATOR

 

 

 

 

 

 

 

 

IN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER

 

 

 

 

 

 

 

 

 

 

 

AUTOCLOSE

 

 

 

 

60

 

STATUS

 

 

 

 

 

 

 

 

OFF

 

120

 

 

 

 

 

 

 

 

INERTIA

 

 

 

MIN

 

MAX

 

 

 

 

 

 

 

 

OBSTRUCT

 

 

 

 

SENS

.

 

 

 

 

 

PULL/PUSH

 

 

MIN

 

MAX

 

 

 

 

 

 

 

 

 

SNGL/DUAL

 

 

 

LEARN

SEQ1

 

 

 

SEQ2

 

 

 

WHT

 

 

 

 

GRN ORG BLU

R

B

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RCVR

 

ACCESSORY

 

 

 

 

ALARM

 

 

 

 

 

20

Image 23
Contents Automatic Gate Operator Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolTable of Contents Important Safety Instructions For the System Designer For the InstallerBefore Installation II. During InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSeries Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Gate Preparation Single Gate Operator InstallationOverview of Operator Installation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitOperator side of the gate see Overview Illustration, Determining the Mounting Position and Mounting the OperatorTo Open the Gate Manually Installing the ChainInstallation of the GTO Transformer Powering the SystemConnecting the Battery Estimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC Another see Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code FCC Regulation Mounting the ReceiverCounter Clockwise Adjusting the Limit SwitchesIf your gate opens from Right to Left However, if your gate opens from Left to RightConnecting Additional Safety Devices Connecting Safety DevicesORG Orange Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green BLU Blue Used with GRN GreenAttaching the Housing Is especially important for safety devices MaintenanceMaintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit This Step is for SL-2000/ 2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep GTO Digital Keypad F300 Accessories Available Through Your DealerACCESS-ORIES Replacement Batteries Installation of this operator conforms to Class Installation Check List