GTO SL-2000 Dual Gate System Installation, Second Gate Auxiliary Operator Parts & Hardware

Page 36

DUAL GATE SYSTEM INSTALLATION

Install the second gate operator in the same manner as the Single gate operator starting on page 14 of this manual. The second gate preparation and wiring of the second (auxiliary) operator follow on the next two pages. Once the second gate operator is installed, Set the DIP switches for DUAL gates and the order in which the gates open (ÒsequencingÓ). Setting the Control Board for Dual Gate Installations begins on

page 37.

SECOND GATE (AUXILIARY) OPERATOR PARTS & HARDWARE

Second Gate Operator

(2)

The SL-2200 comes

2”

with a battery and

squar

control box the SL-1200

does not.

 

e

 

x

 

48”

 

long

Battery

legs

 

(2) Chain Brackets

Battery Cable

 

Operator Housing

32’ Drive Chain

60’ Power Cable w/ Strain Relief

(4) 1/4Ó-20 x 1/2Ó Screws (RB226)

(4) 3/8Ó Lock Washers

(RB641)

(4) 3/8Ó-16 x 2Ó diameter U-Bolts and

(8) 3/8Ó Serrated Nuts (RB210)(2) Chain Master Links (RB208)

(4) 3/8Ó Nuts

(RB668)

(4) 3/8Ó -16 x 3Ó Carriage Bolts (RB659)

(2) Quick Release Pins (211IH)

33

Image 36
Contents Automatic Gate Operator When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesTable of Contents Important Safety Instructions For the Installer Before InstallationII. During Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSeries Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Operator side of the gate see Overview Illustration,Installing the Chain To Open the Gate ManuallyPowering the System Connecting the BatteryInstallation of the GTO Transformer Solar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep Another see Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver FCC RegulationAdjusting the Limit Switches If your gate opens from Right to LeftHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesConnecting Accessories WHT White Used with GRN GreenBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Is especially important for safety devicesTrouble Shooting Guide Maintenance System Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwareControl Unit Wiring the Second Operator This Step is for SL-2000/ 2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories Available Through Your Dealer GTO Digital Keypad F300ACCESS-ORIES Replacement Batteries Installation Check List Installation of this operator conforms to Class