GTO SL-1000, SL-2000 installation manual Setting the Personal Transmitter Code

Page 25

SETTING THE PERSONAL TRANSMITTER CODE

All GTO transmitters are set to a standard code at the factory and are ready to activate the automatic gate operator. For safety and security, however, we strongly recommend that the factory setting be replaced with a personal code. Follow the directions below:

1. REMOVE THE TRANSMITTER COVER

Grasp the sides of the access cover and slide it away from the transmitter button (see illustration). When the access cover is removed, the battery and the DIP switches will be exposed. To set a new code, use a small screwdriver to move the switches.

2.SET THE TRANSMITTER DIP SWITCHES

There are nine (9) transmitter DIP switches; each of which can be placed in three different positions (+, 0, ). DO NOT set all the switches in the same position, such as all +, all 0, or all . Once the DIP switches have been set to a personal code, replace and close the access cover.

WARNING: No other adjustments should be made inside the transmitter.

3. “TEACHTHE NEW CODE TO CONTROL BOARD MEMORY

STATUS

 

 

 

 

 

 

 

 

AUTOCLOSE

60

A.

Turn control box power switch OFF.

 

B.

Unscrew and remove the control box cover.

 

C.

Press and hold the LEARN button on the control board, and

STATUS LED

 

turn the power switch ON. Release LEARN button. Wait 15

 

 

seconds for the receiver to charge.

 

D.Press and hold transmitter button until the red STATUS LED comes ON.

E.Release transmitter button. The new code is stored in the control board memory.

PULL/PUSH

SNGL/DUAL

SEQ1

SEQ2

 

 

 

 

 

 

4

 

 

 

3

 

 

 

2

 

ON

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF120

INERTIA

MIN

MAX

OBSTRUCT

SENS.

MIN MAX

LEARN

R

B

G

 

RCVR

Replace the control box cover and turn the power switch to the ON position.

22

Image 25
Contents Automatic Gate Operator Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolTable of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for GatesSeries Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitOperator side of the gate see Overview Illustration, Determining the Mounting Position and Mounting the OperatorTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer Estimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC Another see Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code FCC Regulation Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Is especially important for safety devices MaintenanceMaintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit This Step is for SL-2000/ 2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep GTO Digital Keypad F300 Accessories Available Through Your DealerACCESS-ORIES Replacement Batteries Installation of this operator conforms to Class Installation Check List