GTO SL-1000 installation manual GTO PRO SL-2000 Series Technical Specifications

Page 13

GTO PRO SL-2000 SERIES TECHNICAL SPECIFICATIONS

DRIVE

¥Powered by a 12 V motor with integral case hardened steel gear reduction to 90 rpm. Generates 310 in. lb. of torque at 12 V. Motor temperature range -30 °F to +160 °F.

¥Gate velocity: 1 ft/s.

POWER

¥The PRO SL-2000system is powered by a 12 Vdc, 7.0 Ah, sealed, rechargeable battery.

¥Battery charge for PRO SL-2000is maintained by a 18 Vac (40 VA) transformer rectified to 14.5 Vdc through the GTO Control Board. Two (2) blade-style control board fuses rated for 20 A.

IMPORTANT: The transformer should not be connected directly to any battery. Transformer must be connected to the control board with a minimum of 16 gauge, multi-stranded, dual conductor, direct burial low voltage wire. Do not replace fuses with higher ampere rated fuses; doing so will void the warranty and may damage the control board.

¥Solar Panel Charger can only be used on the SL-2000 if the optional 24 Amp hour battery kit is used (see Accessory Catalog on page 41). Battery charge maintained by GTO Solar Panel Charger: float voltage 14.5 Vdc output from a 193/8" x 151/4" silicon alloy panel. Generates minimum of 10 W at 600 mA. Gated diode on the control board prevents battery discharge.

CONTROL

¥GTO microprocessor controlled board with temperature compensated circuits. Auto-memorization of digital transmitter code. Charging regulated by circuit on control board. "Sleep draw" is 40 mA; "active draw" is 5 to 13 A.

¥GTO remote-mounted RF receiver tuned to 318 MHz.

¥Limit controls are mechanical. Normally open contact.

¥Adjustable auto-close timer (OFF to 120 s), inertia, and obstruction sensitivity using three (3) potentiometers.

¥Power terminal block accommodates a transformer and solar panels.

¥Operator terminal blocks accommodate safety edges and photoelectric sensors for opening and closing modes.

¥Fully compatible accessory terminal block provides connections for safety loops, wands, intercoms, card readers, phone systems, etc.

¥DIP switches simplify setup of gate operator.

¥audio entrapment alarm sounds if unit obstructs twice while opening or closing.

OPERATIONAL CAPACITY

¥The GTO/PRO SL-2000 and GTO/PRO SL-2000Bwill handle gates weighing up to 1000 lb. (453.4 kg) and up to 30 ft. (9.14 m) in length (per leaf) if the proper installation procedures have been followed. Note that ball bearing rollers and covers should be used on all gates.

¥The GTO/PRO SL-2000series operators are capable of high volume cycling; however, the total cycles per day will depend on the motor current and efficiency of the gate installation (see chart below). For questions relating to specific applications and for information regarding cycling duty when charged by solar panels, call the GTO Service Department at (800) 543-

1236.

Gate Capacity Chart for SL-2000 Series

(estimated number of cycles based on use with a transformer)

Opening

20 ft.

80

70

60

50

 

 

16 ft.

100

90

80

70

 

12 ft.

120

110

100

90

Gate

8 ft.

400 lb.

600 lb.

800 lb.

1000 lb.

 

140

130

120

110

 

 

 

 

 

 

Gate Weight

Cycles shown are for single gate, dual gates will get approximately half as many cycles.

Housing Dimensions:

Height: 18" Width: 211/2" Depth: 11"

Shipping Weight:

Approximately 90 lb.

Rollers should be lubricated at least four times per year.

SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE.

10

Image 13
Contents Automatic Gate Operator Vehicular Gate Operator Class Categories When You Know Multiply By To Find SymbolTable of Contents Important Safety Instructions Before Installation For the InstallerII. During Installation For the System DesignerIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325No ONE should Cross the Path of the Moving Gate For the CONSUMER/END UserPoint hazard Required Safety Precautions for Gates Series Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Mounting the Legs on the Slide Gate Operator Recommended Wiring and USE of ConduitOperator side of the gate see Overview Illustration, Determining the Mounting Position and Mounting the OperatorTo Open the Gate Manually Installing the ChainConnecting the Battery Powering the SystemInstallation of the GTO Transformer Estimated Maximum Number of Cycles Per Day Solar Zones and Gate ActivityStep 18VAC Another see Illustration KRight Control Board SettingsPotentiometers Setting the Personal Transmitter Code FCC Regulation Mounting the ReceiverIf your gate opens from Right to Left Adjusting the Limit SwitchesHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Additional Safety Devices Connecting Safety DevicesWHT White Used with GRN Green Connecting AccessoriesBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Is especially important for safety devices MaintenanceMaintenance Trouble Shooting GuideConnected to these terminals System Test SpecificationsWarranty and Repair Service Limited Two Year WarrantyInstructions for the Installation Dual Slide Gate System Second Gate Auxiliary Operator Parts & Hardware Dual Gate System InstallationControl Unit This Step is for SL-2000/ 2200 Installation only Wiring the Second OperatorRefer to the illustrations on the next Setting the Control Board for Dual Gate InstallationsStep GTO Digital Keypad F300 Accessories Available Through Your DealerACCESS-ORIES Replacement Batteries Installation of this operator conforms to Class Installation Check List