GTO SL-2000 Recommended Wiring and USE of Conduit, Mounting the Legs on the Slide Gate Operator

Page 16

RECOMMENDED WIRING AND USE OF CONDUIT

Run the low voltage wire and receiver wire through PVC conduit into the slider unit to protect it from lawn mowers, weed eaters, grazing animals, etc. PVC conduit should be used for accessory wires such as loop detectors, key pads, card readers or any other entry device.

Roller Guard

Roller Guard

CAUTION

CAUTION

STAND CLEAR

STAND CLEAR

 

Operator

Operator

Roller

Roller Guard

Roller Guard

Roller Guard

 

Separate PVC Cond

Separate PVC Conduits

for power, receiver

for power, receiver

and control wiring.

and control wiring.

 

Conduit through the concrete pad.

Conduit around the concrete pad.

MOUNTING THE LEGS ON THE SLIDE GATE OPERATOR

STEP 1

Mount the legs on the slide gate operator using the 3/8Ó x 3Ó Carriage Bolts, 3/8Ó Flat Washers, 3/8Ó Lock Washers, and 3/8Ó Nuts. See Illustration A.

3/8"-16x3" Carriage Bolts

 

 

 

 

 

 

G

 

 

IN

 

N

 

AR

 

 

W

 

 

 

3/8" Lock Washers

& Nuts

 

 

 

48" x 2" sq. Legs

 

 

Illustration A

 

 

 

13

 

 

 

Image 16
Contents Automatic Gate Operator When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesTable of Contents Important Safety Instructions For the Installer Before InstallationII. During Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSeries Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Overview of Operator Installation Single Gate Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Operator side of the gate see Overview Illustration,Installing the Chain To Open the Gate ManuallyConnecting the Battery Powering the SystemInstallation of the GTO Transformer Solar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep Another see Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver FCC RegulationAdjusting the Limit Switches If your gate opens from Right to LeftHowever, if your gate opens from Left to Right Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesConnecting Accessories WHT White Used with GRN GreenBLU Blue Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Is especially important for safety devicesTrouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwareControl Unit Wiring the Second Operator This Step is for SL-2000/ 2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories Available Through Your Dealer GTO Digital Keypad F300ACCESS-ORIES Replacement Batteries Installation Check List Installation of this operator conforms to Class