GTO SL-2000, SL-1000 installation manual Attaching the Housing

Page 30

ATTACHING THE HOUSING

IMPORTANT Safety Instructions

Mount the operator housing after all installation procedures are complete. Slide operator housing over legs, align holes, and use screws provided to attach housing to operator.

IMPORTANT: Hang the two (2) GTO Warning Signs (provided) on both sides of the gate before operating. Make sure all warning signs and labels are in place. Make sure that the packet containing end user safety instructions and warranty procedures remains attached to the operator housing (as shown in the illustration).

Review the safety precautions & operator warranty procedures contained in packet (attached to the operator housing) with the customer. Leave packet attached to the housing for future reference.

27

Image 30
Contents Automatic Gate Operator When You Know Multiply By To Find Symbol Vehicular Gate Operator Class CategoriesTable of Contents Important Safety Instructions II. During Installation For the InstallerBefore Installation For the System DesignerIII. After Installation Entrapment Alarm UL 325 Secondary Means of Protection Against EntrapmentFor the CONSUMER/END User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Gates Point hazardSeries Moving Gate Can Cause Injury Or Death GTO PRO SL-1000 Series Technical Specifications GTO PRO SL-2000 Series Technical Specifications Parts Identification Single Gate Operator Installation Overview of Operator InstallationGate Preparation Recommended Wiring and USE of Conduit Mounting the Legs on the Slide Gate OperatorDetermining the Mounting Position and Mounting the Operator Operator side of the gate see Overview Illustration,Installing the Chain To Open the Gate ManuallyPowering the System Connecting the BatteryInstallation of the GTO Transformer Solar Zones and Gate Activity Estimated Maximum Number of Cycles Per DayStep Another see Illustration K 18VACControl Board Settings RightPotentiometers Setting the Personal Transmitter Code Mounting the Receiver FCC Regulation However, if your gate opens from Left to Right Adjusting the Limit Switches If your gate opens from Right to Left Counter ClockwiseConnecting Safety Devices Connecting Additional Safety DevicesBLU Blue Used with GRN Green Connecting AccessoriesWHT White Used with GRN Green ORG Orange Used with GRN GreenAttaching the Housing Maintenance Is especially important for safety devicesTrouble Shooting Guide MaintenanceSystem Test Specifications Connected to these terminalsLimited Two Year Warranty Warranty and Repair ServiceInstructions for the Installation Dual Slide Gate System Dual Gate System Installation Second Gate Auxiliary Operator Parts & HardwareControl Unit Wiring the Second Operator This Step is for SL-2000/ 2200 Installation onlySetting the Control Board for Dual Gate Installations Refer to the illustrations on the nextStep Accessories Available Through Your Dealer GTO Digital Keypad F300ACCESS-ORIES Replacement Batteries Installation Check List Installation of this operator conforms to Class