18 Series Installation - Separate Units
4 Showerhead and Tub Spout Installation | |||
A. | 1 | FOR SHOWERHEAD INSTALLATION: | |
Connect top outlet (1) to shower arm (2) | |||
| |||
|
| with proper fittings. To prevent damage | |
|
| to finish on shower arm, insert wall end | |
|
| of shower arm into shower flange (3) | |
3 |
| before screwing arm into riser connection. | |
| Thread showerhead (4) onto shower | ||
2 |
| arm. Apply Teflon® tape to pipe threads on | |
|
| ||
|
| both ends. Do not overtighten | |
|
| showerhead. | |
4 |
|
|
FOR TUB SPOUT INSTALLATION:
Refer to the installation instructions supplied with your spout. Do not connect deck mount spouts to
| ||
The copper tube (1) must be 1/2” nominal | ||
| ||
| copper. Important: If it is necessary to | |
| cut the copper tube, the end must be | |
| chamfered free of burrs to prevent cutting | |
| or nicking | |
1 | spout over copper tube flush with the | |
finished tub or wall surface. Tighten set | ||
2 | screw (2), but do not overtighten. | |
|
1
1 |
3 2
Iron Pipe Installation
Install threaded pipe nipple (1) to extend past finished wall. Apply Teflon® tape to threads on pipe nipple and screw on tub spout.
Copper Sweat Installation
Remove
7