Frymaster 45 Series manual Door Assembly

Page 73

DOOR ASSEMBLY

1

5

4

2

7

3

6

5

ITEM

PART #

COMPONENT

 

806-8320

Door Assembly Complete, Enameled Steel (does not include Items 3 and 5)

 

806-6405SP

Door Assembly Complete, Stainless Steel (does not include Items 3 and 5)

1106-0554SP Door Pin Assembly

2826-1343 Spring, Door Pin

3810-1422 Handle, Door, Wireform, Stainless Steel (must be ordered separately)

4826-1379 Screw, #10 x ½” Phillips Head, Zinc Plated

5810-1508 Hinge, Door, Universal (must be ordered separately)

6824-0616SP Panel, Door, Outer

7

900-4807

Liner, Door

*

810-1105

Magnet, Door

* Not illustrated.

2-25

Image 73
Contents Gas Fryers Hour Service HotlineCanada Page Series GAS Fryers Service and Parts Manual Table of Contents Parts List This page Intentionally Left Blank Functional Description Interface Boards 806-3548, 806-5490, Series Interface Board LED Diagnostic Lights Accessing Fryers for Servicing CE Standard Burner Manifold Gas Pressures Adjusting the Pilot FlameCalibrating the Thermostat Control Cleaning the Gas Valve Vent TubeDisconnect Grounding wire Replacing the Temperature Probe Unplug Harness Disconnect Grounding wire Page Disconnect fryer from electrical and gas supplies Bend clip to release thermopile Replacing the Frypot Troubleshooting and Problem Isolation Ignition Failures CE Standard For Incoming Gas Pressures Improper Burner FunctioningImproper Temperature Control Computer-Related Problems Filtration Problems Sediment Particle Oil Flow Up for reverse Down for Forward Basket Lift Malfunctions Leakage ProblemsBell Crank Basket Lift Simplified Schematic Manual Push-Button BINDING/JAMMING Problems Bell Crank Basket Lift Simplified Wiring Diagram Modular Basket Lift Simplified Wiring Diagram Interpretation of Digital Controller Lights Troubleshooting GuidesVerify that the ON/OFF switch is in the on positon Pin 6? Xfmr Troubleshooting the Gas Valve Troubleshooting the Thermostat Troubleshooting the Temperature Probe Probe Resistance Chart Plan Wiring Diagram Wiring DiagramsPlan Wiring Diagram CE 230V MJ45 W/COMPUTER and Basket Lift Plan Wiring Diagram CE FM/MJ 45 W/0 Computer Inset A-A Plan Wiring Diagram Series Basket Lift System Plan Wiring Diagram Series Basket Lift System This page Intentionally Left Blank Series GAS Fryers Service and Parts Manual Parts List Parts BellCrankBasket LiftComponent Modular Basket Lift 208-250V ConfigurationMount, Modular Basket Lift Burner Assembly Component Parts Component Cabinet Assemblies and Component Parts MJ45 Batteries Enameled use 902-9324SP for side with access openingsFM145 Filter on Left FM45 Batteries with Built-In FiltrationComponent Filter Magic II Add-On Cabinet Components Side, Left Cabinet, w/Access Openings CASTERS, LEGS, and Associated Hardware Components Page Complete Shield Assemblies Complete Box Assembly This page Intentionally Left Blank Page Component Controller Assemblies Thermostat Controllers Set Screw Controller Assemblies Other than Thermostat Controllers Door Assembly DrainSystem Components Component Component Filter Magic II Filter Pan AssembliesFrypot Assemblies and Component Parts OIL Component Through March April 2001 and Later Power Shower Assembly Temperature PROBE, THERMOSTATS, and Related Components Wiring Assemblies and Harnesses Wiring ASSEMBLIES/HARNESSES and Remote Cable AssembliesPower Cords Wiring CONNECTORS, PIN TERMINALS, and Power CordsThis page Intentionally Left Blank Service Hotline