Frymaster 45 Series manual Series Interface Board LED Diagnostic Lights

Page 9

FREQUENTLY USED TEST POINTS FOR 45 SERIES INTERFACE BOARDS

 

Meter

 

 

Test

Setting

Pins

Results

12 VAC Power to Controller

50 VAC Scale

1 and 3 of J2

12-18

24 VAC Power

50 VAC Scale

24 VAC Terminals

22-28

24 VAC Power to Gas Valve

50 VAC Scale

6 on J1 and GROUND

22-28

120 VAC Power

250 VAC Scale

7 and 12 of J1

110-125

Probe Resistance*

R x 1000 OHMS

2 and 3 of J1

**

*Disconnect 15-Pin harness from controller before testing probe circuit.

**See Probe Resistance Chart at end of chapter.

Four LEDs, arranged across the top of the boards and identified in the table below, are provided to assist in troubleshooting.

45 SERIES INTERFACE BOARD

LED DIAGNOSTIC LIGHTS

GV Indicates 24 VAC to the gas valve

AL Indicates open Drain Safety Switch (if installed)

24V Indicates 24 VAC from transformer

COMP Indicates 12 VAC to computer

Every board contains one heat relay (K3), and may contain two basket lift relays (K1 and K2). As shipped from the factory, fryers with bell crank basket lifts will have relays K1, K2, and K3. All other factory-original fryers will have boards with only relay K3.

THERMOSTATS AND TEMPERATURE PROBES

Different types of thermostats are used in 45 Series fryers, depending on the fryers’ configuration.

Fryers equipped with Thermostat Controls have an adjustable controlling (operating) thermostat. The temperature at which the thermostat opens and closes is adjusted by physically changing the set- ting of the thermostat itself by means of an attached knob. When new, the Fenwal controlling ther- mostat used in 45 Series fryers is sensitive to one-degree changes in temperature.

CAUTION

Fenwal thermostats are used in a number of Frymaster products. The thermostat for the 45 Series is 4 inches long. Do not use 3-inch Fenwal thermostats in 45 Series fryers.

Fryers equipped with all other type controls have a temperature probe. In these units, the probe resistance varies directly with the temperature. That is, as the temperature rises, so does resistance at a rate of approximately 2 ohms for every 1º (F or C). Circuitry in the controller monitors the probe resistance and controls burner firing when the resistance exceeds or falls below programmed temperatures (setpoints). The temperatures are programmed by means of a keypad on the face of the controller.

All 45 Series fryers are equipped with a high-limit thermostat. In the event that the fryer fails to properly control the oil temperature, the high-limit thermostat prevents the fryer from overheating to the flash point. The high-limit thermostat acts as a normally closed power switch that opens when

1-3

Image 9
Contents Gas Fryers Hour Service HotlineCanada Page Series GAS Fryers Service and Parts Manual Table of Contents Parts List This page Intentionally Left Blank Functional Description Interface Boards 806-3548, 806-5490, Series Interface Board LED Diagnostic Lights Accessing Fryers for Servicing CE Standard Burner Manifold Gas Pressures Adjusting the Pilot FlameCalibrating the Thermostat Control Cleaning the Gas Valve Vent TubeDisconnect Grounding wire Replacing the Temperature Probe Unplug Harness Disconnect Grounding wire Page Disconnect fryer from electrical and gas supplies Bend clip to release thermopile Replacing the Frypot Troubleshooting and Problem Isolation Ignition Failures CE Standard For Incoming Gas Pressures Improper Burner FunctioningImproper Temperature Control Computer-Related Problems Filtration Problems Sediment Particle Oil Flow Up for reverse Down for Forward Basket Lift Malfunctions Leakage ProblemsBell Crank Basket Lift Simplified Schematic Manual Push-Button BINDING/JAMMING Problems Bell Crank Basket Lift Simplified Wiring Diagram Modular Basket Lift Simplified Wiring Diagram Interpretation of Digital Controller Lights Troubleshooting GuidesVerify that the ON/OFF switch is in the on positon Pin 6? Xfmr Troubleshooting the Gas Valve Troubleshooting the Thermostat Troubleshooting the Temperature Probe Probe Resistance Chart Plan Wiring Diagram Wiring DiagramsPlan Wiring Diagram CE 230V MJ45 W/COMPUTER and Basket Lift Plan Wiring Diagram CE FM/MJ 45 W/0 Computer Inset A-A Plan Wiring Diagram Series Basket Lift System Plan Wiring Diagram Series Basket Lift System This page Intentionally Left Blank Series GAS Fryers Service and Parts Manual Parts List Parts BellCrankBasket LiftComponent Modular Basket Lift 208-250V ConfigurationMount, Modular Basket Lift Burner Assembly Component Parts Component Cabinet Assemblies and Component Parts MJ45 Batteries Enameled use 902-9324SP for side with access openingsFM145 Filter on Left FM45 Batteries with Built-In FiltrationComponent Filter Magic II Add-On Cabinet Components Side, Left Cabinet, w/Access Openings CASTERS, LEGS, and Associated Hardware Components Page Complete Shield Assemblies Complete Box Assembly This page Intentionally Left Blank Page Component Controller Assemblies Thermostat Controllers Set Screw Controller Assemblies Other than Thermostat Controllers Door Assembly DrainSystem Components Component Component Filter Magic II Filter Pan AssembliesFrypot Assemblies and Component Parts OIL Component Through March April 2001 and Later Power Shower Assembly Temperature PROBE, THERMOSTATS, and Related Components Wiring Assemblies and Harnesses Wiring ASSEMBLIES/HARNESSES and Remote Cable AssembliesPower Cords Wiring CONNECTORS, PIN TERMINALS, and Power CordsThis page Intentionally Left Blank Service Hotline