Maytag W10199707A installation instructions Determine Cabinet Opening

Page 13

Wiring configuration

Power supply wire:

 

Terminal box wire:

white

 

white

 

black

 

black

 

ground wire

 

ground connector

 

If needed, see website for animated representation of this step. Visit www.maytag.com under FAQ tab.

4

Tighten strain relief screws to secure cord.

5 Power Cord—Reinstall

terminal box cover

Place wires inside terminal box. Insert tabs on left side of cover. Make sure wires are tucked inside box. Close cover ensuring wires are not pinched. Use 1/4" nut driver and previously removed screw to secure cover.

NOTE: Do not plug into outlet until instructed to do so.

Determine Cabinet Opening

1 Measure cabinet opening

Measure height of cabinet opening from underside of countertop to floor where dishwasher will be installed (you will need to measure the lowest point on the underside of the countertop and the highest point on the floor). Refer to “Dishwasher Height Adjustment Chart” for wheel position and the number of turns needed.

Dishwasher Height Adjustment Chart

Cabinet

Wheel

Number of turns

opening height

position

on front leg

33 7/8" (86.0 cm)

remove

All the way up

34" (86.4 cm)

1

10

34 1/4" (87 cm)

2

5

34 1/2" (87.6 cm)

3

0

NOTE: If the minimum cabinet opening height is less than 34"(86.4 cm), the rear wheels can be removed for additional clearance. This will allow the dishwasher to fit into a 33 7/8" (86 cm) high cabinet opening, but the dishwasher will be more difficult to move. (Measurements are approximate. Wheels and legs are preset at the factory for 34 1/2" [87.6 cm].)

2 Adjust wheels and legs

1

2

3

wheel

Turn both leveler legs to the same height. Put wheels in the required position determined from “Dishwasher Height Adjustment Chart.”

13

Image 13 Contents
W10199707A You Need to Table of ContentsTools and Parts Location Requirements Removed Product and Cabinet Opening DimensionsWater Supply Requirements Drain RequirementsElectrical Requirements Use of air gapPrepare Cabinet Opening-New Utilities Prepare Cabinet Opening-Existing UtilitiesPrepare and Route Water Line Install Drain Hose Install moisture barrier on some models Install moisture barrier on some modelsNo waste disposer no air gap Waste disposer with air gapPrepare Dishwasher Power Cord-Route cord into terminal box Make Power Supply Cord ConnectionPower Supply Cord- Connect ground wire Power Cord-Connect remaining wiresDetermine Cabinet Opening Move Dishwasher into Cabinet Opening Install the Door Handle on some modelsOpen and close door Check water and drain hose positionCloses too quickly Decrease spring tension Door falls open Increase spring tensionConnect to Water Supply Slide clamp onto connector Make Direct Wire Electrical ConnectionDirect Wire--Route cable into terminal box Connect to DrainDirect Wire-Connect remaining wires Direct Wire-Connect ground wireDirect Wire-Secure cable in strain relief Direct Wire-Reinstall terminal box coverSecure Dishwasher in Cabinet Opening Complete Installation Reconnect power Power supply cord-Plug into a grounded 3 prong outletCheck Operation If Dishwasher Does Not OperatePage Il faut Table des matièresOutillage et pièces Exigences demplacement Espacelibre Spécifications de l’alimentation en eau Exigences dévacuationSpécifications électriques Utilisation du dispositif de brise-siphonFermeture de lalimentation en eau Interromprelalimentation électriqueLutilisateur possède-t-il déjà des moyens de raccordement? Quel type de connexion lutilisateur emploie-t-il?Cordon dalimentation électrique Préparation du trou Préparation et acheminement de la canalisation d’eauPerçage du trou Raccordement direct Préparation du trouInstallation du tuyau d’évacuation Pas de broyeur à déchets avec brise-siphon Pas de broyeur à déchets sans brise-siphonBroyeur à déchets avec brise-siphon Placer le lave-vaisselle sur le dos Préparation du lave-vaisselleDépose des panneaux Application de ruban adhésif Téflon ou composé détanchéitéRaccordement du cordon dalimentation Installation dun serre-câbleÉvaluation de l’ouverture dencastrement du placard Configuration du câblageMesure de louverture dencastrement du placard Tableau de réglage de la hauteur du lave-vaisselleInstallation de la poignée de porte Installation de la poignée de porte sur certains modèlesDéplacement du lave-vaisselle à proximité de louverture Planchers surélevés Ajouter des cales si nécessaireInsertion du lave-vaisselle dans louverture du placard Ouverture et fermeture de la porteRaccordement à l’alimentation en eau Méthode recommandée Méthode facultativeVérification de laplomb et réglage des pieds si nécessaire Enfiler lécrou et la virole sur la canalisationEnfilement de la bride sur le raccord Raccordement au circuit dévacuationRecherche de fuites Position définitive de la bride de tuyauRaccordement direct Raccordement du fil de mise à la terre Raccordement électrique directRaccordement direct Raccordement des fils restants Raccordement direct Fixation du câble dans le serre-câble Achever linstallation Serrage des vis Inspection de la rive de panneau inférieureReconnexion de lalimentation électrique Rétablir l’alimentation électriqueSi le lave-vaisselle ne fonctionne pas correctement Contrôle du fonctionnementConseils supplémentaires