Belshaw Brothers 616BT manual Contents, Sections, Appendixes

Page 5
Contents

Contents

Sections

1

Installation

1

Unpacking the Fryer

1

Initial Cleaning

1

Installing the Fryer

1

Moving the Fryer

2

2

Operation

3

3

Cleaning

5

Cleaning the Exterior Surfaces

5

Cleaning the Frying Screen

5

Cleaning the Kettle

5

Removing the Shortening

5

Washing

6

4

Calibrating The Fryer

7

Appendixes

A Donut-Making Helps

8

Tips on Making Quality Cake Donuts

8

Calculating Correct Water Temperature

9

Ratios of Plunger Sizes to Donut Weights

9

Temperature Conversion

9

B

Electrical Components

10

 

Testing the Continuity of the Toggle Switch

10

 

Testing the Continuity of the Thermostat

11

C

Parts Lists

14

 

D

Wiring Diagrams

17

 

Limited Warranty

Insert

 

Belshaw Bros., Inc. 1750 22nd Ave. S. Seattle, WA 98144 Phone 206-322-5474 Fax 206-322-5425

616B & 616BT Counter Top Fryer

MN-1136EN

iii

Image 5
Contents 616B & 616BT Operator’s ManualCounter Top Fryers ModelsPage EQUIPMENT RECORD Page Appendixes ContentsSections Preface Initial Cleaning 1InstallationInstalling the Fryer Unpacking the FryerDo not touch hot shortening. It can cause serious burns Moving the FryerThoroughly clean and dry the floor if Air spaces can cause the shortening to overheat and catch on fire 2OperationHot shortening causes severe burns Frying Tips Cleaning the Frying Screen Cleaning3Cleaning the Exterior Surfaces Cleaning the KettleWashing Calibrating The Fryer Calibration of Temperature IndicatorCalibrating the Thermostat To check calibration, use the following stepsD Wiring Diagram E Limited Warranty AppendixesA Donut-Making Helps B Electrical Components C Parts Lists A Donut-Making Helps Care, Maintenance and Cleaning Plungers Cylinders and HoppersWashing Plungers, Cylinders and Hoppers by Hand Machine Washing Plungers, Cylinders and HoppersSpecial Instructions for the care of French Plungers Tips on Making Quality Cake DonutsCalculating Correct Water Temperature Ratios of Plunger Sizes to Donut WeightsTemperature Conversion Donut Weight perB Electrical Components Testing the Continuity of the Toggle SwitchTesting the Continuity of the Thermostat Parts Lists BILL OF MATERIAL FIGURE C-1. 616B/616BT FINAL ASSEMBLYFASTENERS ITEM QTY. PART NOFIGURE C-2. 616B/616BT HEATER HEAD ASSEMBLY Wiring Diagrams 616B & 616BT Counter Top Fryer US/Canada/Mexico Limited Warranty and Return Policy Exclusions Procedure for ReturnReturn goods must be Please note the followingOperator’s Manual Type NDonut Cutter Page Seattle, WA 98144-4590 USA Phone 206 Fax 206 Toll Free 800 Email service@belshaw.com0103 MN-1541EN Belshaw Bros., Inc 1750 22nd Avenue South Page Page Page Contents DANGER Installation of Wall Mount Installation1To Assemble the Cutter Installation of Fryer MountOperation2 NOT IMMERSE THIS UNIT TO WASH OR RINSE Maintenance4 Appendix5 Factory Parts and Repair Service Donut Cutter Type N MN-1541ENMN-1541EN Donut Cutter Type NDonut Cutter Type N MN-1541ENMN-1541EN Donut Cutter Type NPage Page for PLUNGERS and HOPPERS CARE, MAINTENANCE, and CLEANING INSTRUCTIONNOTE “O” Rings are not used on plungers for Type K Depositors Washing Plungers and Hoppers by HandTemperature Conversion Ratios of Plunger Sizes to Donut WeightsCalculating Correct Water Temperature TABLES AND FORMULAS USED IN DONUT MAKINGTips on Making Quality Cake Donuts Batter Temperature Chart Fahrenheit Care and Cleaning of Belshaw Cutters and DispensersList of Approved Cleaners for Aluminum