Henny Penny 590, 592 manual Upright, Reversing the LID, Gasket

Page 8

Model 590/592

2-10. TILTING THE LID The Lid Assembly is easily tilted up for cleaning or servicing.

UPRIGHT

1.Raise the lid and remove racks and carrier.

2.Grasping the lid handle, lift the front of the lid up until it stops in an upright position.

 

Be sure the metal arm on the left side of the lid is in the

 

vertical position holding lid upright, or severe injuries

 

could result. (See photo at left).

2-11. REVERSING THE LID

The gray rubber gasket surrounding the inside of the lid is de-

GASKET

signed to be reversed.

 

Because of heat expansion and the pressure used for cooking

 

process, gasket is constantly under extreme stress. Reversing

 

the lid gasket will help to assure that the fryer will not lose

 

pressure through leakage.

1.Put the lid in the upright position, as previously described.

2.Using a thin blade screwdriver, pry out the gasket at the corners. Remove the gasket.

Check the gasket for any tears or nicks. If the gasket is damaged it needs to be replaced.

Be sure the metal arm on the left side of the lid is in the vertical position holding lid upright, or severe injuries could result. (See photo in Tilting Lid Upright section)

3.Clean the gasket and gasket seat with hot water.

4.Rotate the gasket with the opposite side facing out.

Install the 4 corners of the lid gasket. Smooth gasket into place, working from the corners towards the middle of each side.

2-8

1103

Image 8
Contents Maintenance Maintenance HintsIntroduction PreventiveCheckout High Temperature Limit Control Fuse HoldersReplacement Temperature Probe Replacement Excess force will damage temperature probeEvery 90 days Yearly InspectionGasket UprightReversing the LID Model 590/592 Against to seal the lid Pressure PADPressure pads are plastic strips that the lid cam presses LID Adjustment Solenoid Valve If the core-disc assembly is sticking due to buildup Deadweight Valve Solenoid ValveDeadweight Valve Removal & Cleaning Safety Relief ValveCleaning Steps ValvePressure Gauge Calibration StepsContactors 30 31 34 35If either contactor proves defective, replace as follows Wires Power AmperageHeating Elements Heating Elements 4 mm Gap Drain valve opens when the drain valve handle is pulled Drain ValveExtension Out and drains the shortening out of the potNylatron Strips Replacement Nylatron Strips Replacement