GE ZSC1201SS, ZSC1202SS Install Bottom Trim, Install Mounting Screws, Finalize Installation

Page 15

Installation Instructions

4 INSTALL BOTTOM TRIM

CAUTION:If installing the Advantium 120V Oven below 36, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces.

NOTE: If installing the Advantium 120V Oven

with an accessory storage drawer, the bottom trim is not required. Proceed to Step 5.

Installation Below 36, align trim tabs on the plastic trim to slots in the bottom of the oven.

Plastic Trim

Installation Above 36, align trim tabs on the plastic or metal trim to slots in the bottom of the oven.

Plastic Trim

OR

Metal Trim

Secure the bottom trim to the bottom of the oven using 3 screws provided.

6 INSTALL MOUNTING SCREWS

Slide the oven the remaining way into the opening so that the side flanges and control panel are against the cabinet frame. Make sure that the oven is centered in the opening.

Open the door, place a turntable tray in the oven and make sure that the tray in the unit is level.

Drill pilot holes through the side flanges.

Drive the color-matched screws into the side flanges. It is recommended that the screws be hand tightened.

If installing oven with an accessory storage drawer:

Open the drawer.

Drill pilot holes through the side flanges.

Drive color-matched screws into the side flanges. It is recommended that the screws be hand tightened.

NOTE: If installing the Profile Advantium 120V Oven with an accessory storage drawer, you must use the Under-the-Counter (UTC) mounting bracket for the drawer.

If installing the Monogram Advantium integrated model ZSC1201 above 36, the UTC mounting bracket for the accessory storage drawer must be used.

5INSTALL BOTTOM TRIM WITH ACCESSORY DRAWER

If installing with an accessory drawer, see installation instructions on page 17 or instructions that come with the accessory drawer.

7FINALIZE INSTALLATION

Turn power on at the source. The interior light should come on when the door is opened.

Refer to Owner’s Manual for operating instructions.

15

Image 15
Contents Installation Instructions Models Available Contents8 ″ Safety glasses or gogglesParts Supplied Advance PlanningSingle Advantium 120 Installation Electrical RequirementsElectrical Location Prepare the Opening Single Advantium 120V InstallationInstallation over a GE/Monogram Oven and Warming Drawer Installation over a GE/Monogram oven″ Min Drawer30″ 23-1/2″ 17-1/2″ 25-1/4″2″Min 2″Recommended All Four Sides 30″23-1/2″21 ″ 30″ 21″ 36-3/4″ Min 23-1/2″ 25-1/4″ Construct SolidWarming Drawer 21″ 25-1/4″ Cooktop Installation Instructions Discard plastic trim. Replace screws Slide the Oven Into the CutoutInstall Bottom Trim Install Mounting ScrewsFinalize Installation JX2200BB-Black JX2201SS-Stainless Steel ZX2201SS-Stainless Steel for installation above 36″ onlyAllow 15″ clearance When fully open Tools RequiredAssembling the Oven to Drawer Remove Packaging and PartsAssembling the Oven to Drawer Page GE Consumer & Industrial