Installation Preparation
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation beside another GE/Monogram
•If you are mounting one
4-1/2″ Min.
(5-1/2″ Recommended)
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram 30″ or 36″ Cooktop or Countertop:
Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size. See the label on top of the oven for approved cooktop models. This oven requires a separate, properly grounded
Cooktop
25″
Cooktop
36″
Countertop
Height
Cooktop height including depth of electrical box on some models. Refer to cooktop installation instructions.
No minimum clearance required between cooktop and oven.
4″ High Toekick
NOTE: The oven is only approved to be installed under the specific models as labeled on the unit.
8