GE PSB1201SS, ZSC1201SS, ZSC1202SS Remove Packaging and Parts, Assembling the Oven to Drawer

Page 17

ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN

1REMOVE PACKAGING AND PARTS

Remove the drawer from the carton.

Remove all packing material and tape.

Open the drawer and remove any parts inside.

Locate parts.

Side Supports (2)

Assembly Instructions

Under-the-Counter (UTC)

Mounting Bracket

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screws

 

 

 

 

Color-Matched

 

(6 required,

 

 

Screws

 

2 extra)

 

 

(4 required,

 

 

 

 

1 extra)

 

 

 

 

 

 

 

 

 

2UNDER-THE-COUNTER (UTC) MOUNTING BRACKET INSTALLATION

NOTE: For UTC models PSB1200, PSB1201 and ZSC1201 only.

AOpen the accessory drawer so you have access to the top bracket .

BRemove the three screws securing the top bracket .

CInstall the new UTC mounting bracket using the screws removed previously.

3 ASSEMBLING THE OVEN TO DRAWER

APlace storage drawer on a surface with the front of drawer hanging over the edge of the surface. Not placing the front edge of drawer over the edge of the surface may result in damage to the drawer since the front edge of drawer hangs below the bottom

of drawer.

BPlace the oven on top of the storage drawer. Make sure that the back and sides of the oven align with the back and sides of drawer.

NOTE: The bottom of the oven side flanges will sit directly in front of the top of the storage drawer side flanges.

D

Close the drawer and proceed with the installation.

17

Image 17
Contents Installation Instructions Models Available ContentsParts Supplied Safety glasses or gogglesAdvance Planning 8 ″Electrical Location Single Advantium 120 InstallationElectrical Requirements Prepare the Opening Single Advantium 120V InstallationInstallation over a GE/Monogram Oven and Warming Drawer Installation over a GE/Monogram oven30″ 23-1/2″ Drawer17-1/2″ 25-1/4″ ″ Min2″Min 2″Recommended 21 ″ 30″23-1/2″30″ 21″ 36-3/4″ Min 23-1/2″ 25-1/4″ Construct Solid All Four SidesWarming Drawer 21″ 25-1/4″ Cooktop Installation Instructions Discard plastic trim. Replace screws Slide the Oven Into the CutoutFinalize Installation Install Bottom TrimInstall Mounting Screws Allow 15″ clearance When fully open ZX2201SS-Stainless Steel for installation above 36″ onlyTools Required JX2200BB-Black JX2201SS-Stainless SteelAssembling the Oven to Drawer Remove Packaging and PartsAssembling the Oven to Drawer Page GE Consumer & Industrial