Installation Preparation
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING
The Advantium 120V can be installed in combination with other GE/Monogram appliances. Always follow each product’s Installation
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram Warming Drawer:
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30″ wide single oven cabinet or cut the opening in a wall to the dimensions shown.
30″23-1/2″
25-1/4″
17-1/2″
30″
Construct Solid Bottom Min. 3/8″ Plywood Supported
by 2 x 4 or 2 x 2 Runners all Four Sides
2″ Min.
(3″ Recommended)
Per Warming
Drawer
Requirement
Construct Base Min. 3/8″ Plywood Supported by 2 x 4 or
2 x 2 Runners all Four Sides
•Allow
•Oven overlaps will conceal cut edges on all sides of the opening.
When installed over a single oven or a warming drawer, allow at least 2″ between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120V and the other appliance overlaps.
Construct a solid oven floor of 3/8″ min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides.
•The support must be level and rigidly mounted, flush with the bottom edge of the cutout .
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height . See Warming Drawer installation instructions for details.
5