GE
PSB1200BB, ZSC1201SS, ZSC1202SS, PSB1201SS, PSB1200WW
installation instructions
Install
Safety
Page 19
Notes
19
Page 18
Page 20
Image 19
Page 18
Page 20
Contents
Installation Instructions
Models Available
Contents
8 ″
Safety glasses or goggles
Parts Supplied
Advance Planning
Electrical Requirements
Single Advantium 120 Installation
Electrical Location
Prepare the Opening
Single Advantium 120V Installation
Installation over a GE/Monogram Oven and Warming Drawer
Installation over a GE/Monogram oven
″ Min
Drawer
30″ 23-1/2″
17-1/2″ 25-1/4″
2″Min 2″Recommended
All Four Sides
30″23-1/2″
21 ″
30″ 21″ 36-3/4″ Min 23-1/2″ 25-1/4″ Construct Solid
Warming Drawer
21″ 25-1/4″
Cooktop
Installation Instructions
Discard plastic trim. Replace screws
Slide the Oven Into the Cutout
Install Mounting Screws
Install Bottom Trim
Finalize Installation
JX2200BB-Black JX2201SS-Stainless Steel
ZX2201SS-Stainless Steel for installation above 36″ only
Allow 15″ clearance When fully open
Tools Required
Assembling the Oven to Drawer
Remove Packaging and Parts
Assembling the Oven to Drawer
Page
GE Consumer & Industrial
Related pages
How can I troubleshoot issues with my
GC1705 iron
?
Top
Page
Image
Contents