Installation Preparation
Preparation WITHOUT an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation over another GE/Monogram
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram Microwave Oven and over a Warming
30″
23-1/2″
Drawer:
17-1/2″
25-1/4″
Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides
2″ Min.
(3″ Recommended)
30″
Per Oven Requirement
23-1/2″
Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides
3.5″ Min.
(4.5″ Recommended)
Per Warming Drawer Requirement
2″ Min.
(3″ Recommended)
•If you are mounting an
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth
and height . See Warming Drawer installation instructions for details.
CAUTION:For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate
or a total weight of 130 pounds.
7