GE PSB1201SS, ZSC1201SS, ZSC1202SS, PSB1200WW, PSB1200BB Drawer, 30″ 23-1/2″, 17-1/2″ 25-1/4″, ″ Min

Page 7

Installation Preparation

Preparation WITHOUT an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation over another GE/Monogram Under-the-Counter (UTC) oven:

PREPARE THE OPENING (cont.)

Installation under a GE/Monogram Microwave Oven and over a Warming

30

23-1/2

Drawer:

17-1/2

25-1/4

Construct Solid Bottom Min. 3/8Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides

2Min.

(3Recommended)

30

Per Oven Requirement

23-1/2

25-1/4

Construct Solid Bottom Min. 3/8Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides

3.5Min.

(4.5Recommended)

17-1/2

17-1/2

Per Warming Drawer Requirement

2Min.

(3Recommended)

If you are mounting an Under-the-Counter GE/Monogram oven over another, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2minimum shown.

NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth

and height . See Warming Drawer installation instructions for details.

CAUTION:For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds

or a total weight of 130 pounds.

7

Image 7
Contents Installation Instructions Models Available Contents8 ″ Safety glasses or gogglesParts Supplied Advance PlanningElectrical Requirements Single Advantium 120 InstallationElectrical Location Prepare the Opening Single Advantium 120V InstallationInstallation over a GE/Monogram Oven and Warming Drawer Installation over a GE/Monogram oven″ Min Drawer30″ 23-1/2″ 17-1/2″ 25-1/4″2″Min 2″Recommended All Four Sides 30″23-1/2″21 ″ 30″ 21″ 36-3/4″ Min 23-1/2″ 25-1/4″ Construct SolidWarming Drawer 21″ 25-1/4″ Cooktop Installation Instructions Discard plastic trim. Replace screws Slide the Oven Into the CutoutInstall Mounting Screws Install Bottom TrimFinalize Installation JX2200BB-Black JX2201SS-Stainless Steel ZX2201SS-Stainless Steel for installation above 36″ onlyAllow 15″ clearance When fully open Tools RequiredAssembling the Oven to Drawer Remove Packaging and PartsAssembling the Oven to Drawer Page GE Consumer & Industrial