Amana W10261420A installation instructions Prepare Dishwasher

Page 10

Prepare Dishwasher

WARNING

Tip Over Hazard

Do not use dishwasher until completely installed. Do not push down on open door.

Doing so can result in serious injury or cuts.

WARNING

Excessive Weight Hazard

Use two or more people to move and install dishwasher.

Failure to do so can result in back or other injury.

1 Attach insulation

Tabs

Completed

Install

Using the precut slots in the insulation, fasten the insulation over the molded hooks on the tub. Be sure to fasten the insulation down on both sides of the tub.

2 Put dishwasher on its back

Helpful Tip: Place cardboard under dishwasher until installed in cabinet opening to avoid damaging floor covering. Do not use door panel as a work table without first covering with a towel to avoid scratching the door panel.

Using 2 or more people, grasp sides of dishwasher door frame and place dishwasher on its back.

3 Remove panels

Using a ¹⁄₄” hex head socket, nut driver or Phillips screwdriver, remove 2 screws attaching access panel and lower panel to dishwasher.

NOTE: Do not remove tech sheet from access panel.

4 Apply Teflon® tape

or pipe joint compound

Coarse threads

Coarse threads

Apply Teflon tape or pipe joint compound to 90˚ elbow fitting (not provided). Wrap tape around coarse threads 2 to 4 times to avoid leaks.

5 Connect 90° elbow fitting to water inlet valve

Connect 90° elbow fitting to water inlet valve. Using a wrench, tighten elbow until snug, and be sure that it faces to the rear.

10

Image 10
Contents Table of Contents Table des matières W10261420A Dishwasher Safety Pliers Flat-blade Screwdriver Tools and PartsLocation Requirements Flashlight Bath towel Shallow pan Wood blockProduct and Cabinet Opening Dimensions Minimum, measured from narrowest point of openingElectrical Requirements Drain RequirementsWater Supply Requirements Use of air gapPrepare Cabinet Opening Existing Utilities Prepare Cabinet Opening New UtilitiesPrepare and Route Water Line Install Drain Hose No waste disposer with air gap No waste disposer no air gapWaste disposer with air gap Prepare Dishwasher Power Cord-Route cord into terminal box Make Power Supply Cord ConnectionInstall strain relief Power Supply Cord- Connect ground wireDetermine Cabinet Opening Move Dishwasher into Cabinet Opening Closes too quickly- Decrease spring tension Check for plumb and adjust legs if neededOpen and close door Door falls open- Increase spring tensionConnect to Water Supply Direct Wire--Route cable into terminal box Make Direct Wire Electrical ConnectionSlide clamp onto connector Connect to DrainDirect Wire-Secure cable in conduit connector Direct Wire-Connect ground wireDirect Wire-Connect remaining wires Direct Wire-Reinstall terminal box coverSecure Dishwasher in Cabinet Opening Remove towel and replace lower dishwasher rack Complete InstallationReinstall access panels Check lower panel edgeCheck Operation Power supply cord-Plug into a grounded 3 prong outletReconnect power If Dishwasher Does Not OperateInstructions d’installation suite Préparation de la cavité dencastrementExigences d’emplacement Outillage et piècesEn gris sur les parois de la cavité d’encastrement Dimensions Produit et cavité d’encastrementMinimum à l’endroit le plus étroit de la cavité 24 cm Spécifications électriques Spécifications de l’évacuationSpécifications de l’alimentation En eau Utilisation d’un brise-videMoyens de raccordement aux divers circuits déjà existants? Déconnecter la source de courant électriqueFermer l’arrivée d’eau Quel type de raccordement électrique sera utilisé?Préparation et raccordement à la Canalisation deau Installation du tuyau ’évacuation Broyeur à déchets avec brise-vide Pas de broyeur à déchets pas de brise-videPas de broyeur à déchets avec brise-vide Attachez l’isolation Préparation du lave-vaisselleDépose des panneaux Ôter le couvercle du boîtier De connexion électrique Installation du serre-câbleRaccordement électrique Cordon d’alimentation Cordon d’alimentation Conducteur de liaison à la terreMesure des dimensions Dimensions de la cavité ’encastrementConfiguration de câblage Tableau de réglage Hauteur du lave-vaissellePlancher surélevé addition de cales selon le besoin Roues et pieds RéglageDe l’ouverture de la cavité Redresser le lave-vaisselleContrôle de l’aplomb et réglage des pieds si nécessaire La tension des ressortsInsertion du lave-vaisselle dans la cavité d’encastrement IsolantRaccordement à la canalisation Dalimentation en eau Inspection/Recherche des fuitesMise en place de la bride Raccordement à l’égoutRaccordement électrique Câblage direct Bride de tuyau position finaleCâblage direct Raccordement des autres conducteurs Câblage direct Immobilisation par le connecteur de conduitArrimer le lave-vaisselle Extraction du panier inférieurUtilisation d’une serviette Liberté de manœuvre de la porteRéinstallation des panneaux daccès Achever l’installationRéinstallation du panier inférieur retrait de la serviette Contrôle du panneau de plintheConseils additionnels Contrôle du fonctionnementSi le lave-vaisselle ne Fonctionne pas Reconnecter la source de courant électriqueW10261420A