Unified Brands HY-6G(CE) service manual To Align, Door Switch P/N, Door Reversing Procedures

Page 31

To Align:

5.Place a piece of masking tape over the door pin (bullet) hole in the door.

6.Close the door until the door pin just penetrates the masking tape. Make sure the door pin contacts only the door latch spring.

7.If door pin does not strike the center of the spring hole in the U-channel, loosen the hinge-to-oven bolts and align the door to the door pin. Tighten hinge-to- oven mounting bolts.

8.You should be able to pull a dollar bill or comparable piece of paper smoothly between the gasket and oven cavity with the door closed. To adjust the hinge side, loosen the door-to-hinge bolts and align the door gasket with the oven cavity. Tighten the door- to-hinge mounting bolts. To adjust the bullet side refer to 10.30.

9.Operate the steamer and check for leaks.

10.25Door Switch P/N 096857

1.From the right side of the steamer with panel removed, unplug the door switch from the cable harness.

2.The switch (for normal door opening) is held in place with two small screws. With a flat blade screwdriver, remove these screws and the switch may be removed.

3.To install screws for the door switch reverse the above procedure.

4.If the door has been reversed and the switch must be removed and replaced, refer to the top and left side panel removal in Section 10.3 and then remove the switch as above.

10.26Door Reversing Procedures

1.Turn off steamer power and allow steamer to cool.

2.To remove door, support door while removing hinge- to-steamer bolts.

3.Place door with hinge on a flat, clean table (or similar support), with the gasket facing up. Be careful not to scratch door surface.

4.Note and record distance between lock nut and end of door locking pin (bullet). This information will be needed during bullet installation described in Step 6.

5.Loosen lock nut with a wrench. Remove door locking pin and lock nut.

6.Coat bullet threads with NEVER-SEEZ high temperature compound. Install door locking pin and lock nut directly across steamer cavity from old door locking pin location. Install these items so that lock nut-to-end of bullet distance is approximately the same as measured in Step 4.

7.Remove the two truss head screws from above and below the old bullet location and install them above and below the new bullet location.

8.Remove screws and U-channel from the door. Take the magnet and block assembly from present location and place it at the opposite end of the door channel, with the magnet facing outward from the door.

9.Remove screws which secure the handle. Remove door handle from cam.

10.Apply NEVER-SEEZ high temperature (rated for 250ºC) anti-seize and lubricating compound to the cam and Locktite 242 to screw threads.

11.Turn handle and cam 180-degrees from their original positions and install them on the door with screws. Be sure handle and cam move smoothly.

12.Be sure door handle is in the DOWN position. Turn U-channel 180-degrees from its original position, hold door spring in U-channel open with a screwdriver or similar tool, and install U-channel. Don not install the screw at this time.

13.Check operation of the cam. Push up on the door handle and check if the spring opens. If the spring does not open, cam and spring are NOT correctly aligned and problem must be corrected.

14.Apply a light amount of Locktite 242 to screws, then install screws securing U-channel.

15.Apply Locktite 242 to the hinge-to-steamer bolts, then install door and hinge mounting bolts. Do NOT tighten mounting bolts at this time.

16.Align door to steamer. Refer to 10.24, Alignment procedure.

IMPORTANT. When the door is reversed, the alternate door switch (installed at time of manufacture) must be connected to the circuit.

17.From the right side access to the upper portion of the steamer, disconnect the two leads of the door switch.

OM/SM-HY-6G(CE) 31

Image 31
Contents HY-6GCE Hypersteam Atmospheric Convection Important Read First Important References Table of ContentsInspection and Unpacking Equipment DescriptionBpst Connection on the right rear side of the steamer Water ConditioningGas Supply Connection Installation, Start-Up and ConversionGeneral Electrical Supply ConnectionNatural Gas Propane Gas Injector No. Natural Gas Propane GasMBar In. W.C 10.5 in. W.C G20 Natural Gas G31 Propane Gas MBar Inch W.C 26.25 10.5Initial Start-Up Drain ConnectionAutomatic Operation of Pilot Controls Gas Lockout Indicator and Reset ControlOperating Procedure OperationOM/SM-HY-6GCE 12 OM/SM-HY-6GCE CleaningProcedure Outside of Steamer Suggested ToolsSteam Generator and Cooking Chamber If the Service light stays onTroubleshooting Maintenance14 OM/SM-HY-6GCE External Cabinet and Sheet Metal Parts ListKey Description 16 OM/SM-HY-6GCE Cavity Control SectionSteamer Base Section Front 18 OM/SM-HY-6GCE Steamer Base RearSteamer Plumbing 20 OM/SM-HY-6GCE Steamer Motor and ControlsKey Description New Steamer Generator Individual Parts22 OM/SM-HY-6GCE Steamer Individual PartsLeft Side Removal P/N Service ProceduresAdjustable Legs P/N Top Right Side Panel Louvered Removal P/NDrain Box Spray Nozzle P/N To TestWater Inlet Valve Three Way P/N Water Inlet Valve CoilSteam Generator Probes High and Low Water P/N To InstallMain Gas Valve and Gas Pressure Adjustment P/N Steam GeneratorIgniter Module P/N To ReinstallTo Assemble Gas Solenoid Valve P/NPilot Flame Current Check Pilot Switch SW3 Removal P/NTo replace the switch Installation28 OM/SM-HY-6GCE Timer Assembly Timer Fastener NutSteam Generator Gas Jet Manifolds P/N 123704 To Reassemble10.18 Fan Fan Motor Assembly Motor Insulation Motor Shaft SealTo Install a New Motor To Install New Capacitor30 OM/SM-HY-6GCE Door Removal/Installation/Alignment P/NSteam Port Gasket Cavity Steam Hose Assemblies P/N 099953 TopDoor Reversing Procedures Door Switch P/NTo Align 32 OM/SM-HY-6GCE Door Handle, Magnet and Block AssemblyDoor Gasket P/N Door Spring P/NDoor Locking Pin P/N Lock Nut P/N 34 OM/SM-HY-6GCE Electrical SchematicService Log 36 OM/SM-HY-6GCE Limited Warranty To Commercial PurchasersPart Number 128805, REV. C 4/06

HY-6G(CE) specifications

Unified Brands HY-6G(CE) is a pioneering cooking solution in the commercial kitchen landscape, known for its exceptional performance, versatility, and cutting-edge technologies. Designed to meet the rigorous demands of foodservice establishments, the HY-6G(CE) excels at efficiently preparing a wide range of dishes while ensuring consistent quality and safety.

One of the standout features of the HY-6G(CE) is its powerful heating capability. Equipped with advanced infrared heating technology, this unit delivers rapid and uniform heat distribution, making it ideal for both quick service and high-volume operations. The adjustable temperature controls allow chefs to fine-tune the cooking process, ensuring that every dish meets their exacting standards.

Another innovative aspect of the HY-6G(CE) is its energy efficiency. The incorporation of smart energy management systems ensures optimal power usage, reducing operational costs without sacrificing performance. The unit’s environmentally friendly design also aligns with sustainability initiatives, making it a responsible choice for modern kitchens.

The HY-6G(CE) boasts a user-friendly interface that facilitates ease of operation. Its digital display provides real-time feedback on cooking parameters, while programmable settings enable chefs to recall precise cooking profiles for various menu items. This feature not only streamlines kitchen workflow but also enhances productivity, allowing staff to focus on delivering exceptional customer service.

Durability is another hallmark of the HY-6G(CE). Constructed from high-quality stainless steel, it withstands the rigors of daily use in busy kitchens while resisting corrosion and wear. Its compact design allows for easy integration into existing kitchen layouts, making it an excellent option for both new builds and remodels.

Safety is paramount in any culinary environment, and the HY-6G(CE) addresses this with multiple safety features. These include automatic shut-off mechanisms and thermal protection systems that safeguard against overheating, ensuring secure operation even in the most demanding settings.

In summary, Unified Brands HY-6G(CE) stands out in the commercial cooking equipment market due to its blend of power, efficiency, and safety. With features that cater to the diverse needs of any foodservice establishment, it is an invaluable tool for chefs looking to elevate their culinary offerings while maintaining operational excellence. Whether in a bustling restaurant or a catering operation, the HY-6G(CE) is designed to deliver reliable and outstanding results.