Traulsen RBC400RT, RBC200RT owner manual IV. Care & Maintenance

Page 9

III. INSTALLATION (continued)

IV. CARE & MAINTENANCE

III.n - INSTALLING RBC50 CONTROL PANEL:

Model RBC50 is shipped with the control panel detached, and laid flat, taped to the cabinet top (see figure 9). This must be installed before use. To install:

Fig. 9

Remove the packing material and tape holding the con- trol to the top. Remove and retain the six (6) Phillips head screws attaching the control cover to the frame. Also, re- move and retain the 1/4- 20 x 1/2screws found in the cabinet top. Next, position the control frame over the hole in the unit top and attach using 1/2-20x1/2screws (see figure 10).

Fig. 10

NOTE: Extreme care needs to be taken to insure that: a- all wires connecting the control cover to the RBC50 are not damaged in any way, nor mistakenly mounted between the cover and cabinet during installation, which could re- sult in a short circuit, or...

b- that no connections are pulled off the control.

NOTE: Ensure that grommet is firmly in place, aligning round hole in bottom of control housing with round hole in unit top.

Inspect paper roll, label roll, and spindles from rear of con- trol panel before installing panel. Reattach the control cover to the frame using the six (6) Phillips head screws

previously removed.

-8-

WARNING: DISCONNECT ELECTRICAL POWER SUPPLY BEFORE CLEANING ANY PARTS OF THE UNIT.

IV. a - CLEANING THE CONDENSER:

The most important thing you can do to insure a long, reliable service life for your Traulsen is to regularly clean the condenser coil. The self-contained condens- ing unit requires regularly scheduled cleaning to keep the finned condenser clean of lint and dust accumula- tion. Keeping the condenser clean allows the cabinet to operate more efficiently and use less energy.

To clean the self-contained condenser, first discon- nect electrical power to the cabinet and lift up the front louver assembly. To lift this, remove the two screws located on both sides at the bottom of the louver as- sembly. Once the screws are removed, the panel can be pivoted upwards allowing full access to the front facing condenser (for model RBC50, remove the four Phillips head screws from the front louver panel, and lift-off). Vacuum or brush any dirt, lint or dust from the finned condenser coil, the compressor and other cooling system parts. If significant dirt is clogging the condenser fins, use compressed air to blow this clear. Lower louver assembly and replace screws to hold it in place. For care of the remote condensing unit(s) used for models RBC200 & RBC200RT, consult the manufacturers product literature.

IV. b - PRINTER SUPPLIES:

Supplies to support the both standard SmartChill® control printers are available directly from our Parts Department, or from your local Hobart Sales and Service Office. In addition it may also be possible to obtain one of these locally. The record printer paper is standard thermal paper which is readily available at most office supply outlets. Specifications are 2-1/2"wide by 85" long:

Traulsen P/N 400-60003-00

Office Depot #302-224

Staples #PMF-5233

The label printer uses a special peel-off label stock, Traulsen part number 400-60004-00. Each roll contains 225 labels.

IV. c - INSTALLING PRINTER PAPER:

To load the record printer paper, place a roll on the roll shaft. Position the paper such that the paper feeds from the back of the roll. This allows the thermal sen- sitive side of the paper to be on the upper surface as it feeds through the printer. The ends of the roll shaft are installed in the two roll holders.

Gently pull the feed door down and slightly forward. It is located on the bottom of the printer and will open about 90 degrees. Feed the paper into the loading slot directly behind the door and push it up until the paper

Image 9
Contents Important Warranty Notes Introduction Table of ContentsBy Time Type ChillStart Main Menu Blast Chiller Quick Start ChecklistBasic Operating Guidelines II. Receipt Inspection III. InstallationIII. Installation Front IV. Care & Maintenance Reading the Serial TAG OtherVersion VI. the Smartchill Control↓TARGET Temp 0F↑ By TempMain MuteADD/REMOVE Holding AIRChilling AIR ContinueTime ADD 30 Minutes Reset Timer Stop Continue STOP/RESETBy Time Type Chill ↓CYCLE Time Holding↓TIM Smith By Prod↑CHICKEN Parts ↓SOUP Vegetable Chicken PartsBy Product VII. Operating the Blast Chill Control Hold Mode & Defrost MoreDefrost VII. Operating the Blast Chill Control Printing VII. Operating the Blast Chill Control SET UP Products ↓TIM Smith ↑ ↓PASSWORD PIN 07↑ VII. Operating the Blast Chill Control SET UP UsersUsers ADDVII. Operating the Blast Chill Control Syspar ProductsSYS PAR Itemmonth Cancel Enter SYS PAR SET Clock ItemyearCommunicating with Computer Please Wait VIII. Smartchilltm CommunicationsIX. Glossary Replacement Parts List XI. a Food Probe Error During Chill Cycle by Temp XI. Summary of Error MessagesStandard Domestic Warranty XII. Warranty InformationHours of Operation XIII. Mechanical Trouble Shooting Guide