Pitco Frialator L22-345 manual Digital Solid State Control, Primary Solid State Control

Page 83
Digital Solid State Control

Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers

Digital Solid State Control

NOTE: All controller test points are at connector P/J1 (closest connector to the controller).

With 24 VAC supplied to pin #1(24VAC supply) and pin # 5(24VAC input from DVI), the display reads “OFF”.

With the controller turned on, there is a 24 VDC output at pin #9 (side on).

When the controller calls for heat, the display reads “HEAt”, there is a 24 VDC output at pin #8 (HD) and a 24 VAC input at pin #6 (HFB). If the controller does not receive the 24 VAC input at pin #6 in approximately 90 seconds, the controller displays “HEAt” “FAIL”. This indicates a break in the HD or HFB circuit.

To correct, do the following:

1.Check the hi-limit switch. Is it open or tripped?

2.Check the ignition module (sensing pilot flame, locked out, 24 VAC at MV terminal).

3.Check the HD relay on the relay board. Is the HD relay energized continuity through COM and NO contacts?

If display reads “Prob”, Ω test the temperature probe. Check the wires and connectors between the probe and controller for continuity.

If display reads “Prob” “HI”, Ω test the temperature probe, and the wires and connectors between the probe and controller for a short.

If display reads “drn” “tUrn” “oFF”, verify that the drain valve is closed, check the proximity switch on the drain valve.

Primary Solid State Control

NOTE: All controller test points are at connector P/J3 (the 12 pin connector at the controller).

24 VAC is supplied to the controller at pin #1(24VAC supply) and pin #5 (24 VAC input from DVI).

With the controller turned on, there is a 24 VDC output at pin #9 (SO) and the green indicator is illuminated.

When the controller calls for heat, there is a 24 VDC output at pin #8 (HD), the yellow indicator on the left is illuminated, and there is a 24 VAC input at pin #6 (HFB).

When the controller receives the 24 VAC input at pin #6, the yellow indicator on the right is illuminated. If the controller does not receive the 24 VAC input at pin #6, the indicator is not illuminated. This indicates a break in the HD or HFB circuit.

To correct, do the following:

1.Check the hi-limit switch. Is it open or tripped?

2.Check the ignition module (sensing pilot flame, locked out, 24 VAC at MV terminal).

3.Check the HD relay on the relay board. Is the HD relay energized continuity through COM and NO contacts?

If the green and yellow indicators on the left are illuminated and then shut off when the controller is turned on, this indicates an open or shorted probe or wires in between the probe and the controller.

SG/SSH Series Service Manual

83

Image 83
Contents L22-345R0 Solstice Service ManualHigh Efficiency Gas Fryers SG/SSH Series EQUIPMENT REFERENECE INFORMATION NoticeMAILING ADDRESS SHIPPING ADDRESSTheory of Operation Table of Contents24V Model Filter System Troubleshooting and Problem IsolationmV Model Simplified Wiring Diagrams Wiring DiagramsTheory of Operation Heating System Fryer Components OperationOptional Basket Lift Safety SystemFilter System Controller Operational Modes Serial Numbers 24V Model 2. Slide button to solid state Accessing Fryer for Servicing4. Unplug all power cords 1. Press off button on control panelCleaning the Gas Valve Vent Tube Taking a Supply Gas Pressure Reading Checking the Burner Manifold Gas PressureSupply Pressure Table Removing Solid State Thermostat If Necessary Taking a Manifold Gas Pressure Reading Manifold Gas Pressure Table Adjusting Manifold Gas PressureAdjusting Pilot Pressure 4.Tighten collet and replace knob cap Calibrating Solid State Thermostat2.With a 5/16 inch socket, loosen the collet 3.Rotate the knob to point at actual temperatureRemoving the Controller Front Panel Bezel Replacing the Controllers and Wiring HarnessRemoving the Solid State Wiring Harness 6. Remove the controller wiring harness Replacing the Relay Board and Paper Replacing the Ignition Module Replacing the Spinal Tap 8. Disconnect the connection from the valve Top View of Plugs Side View of PlugsReplacing an Igniter/Pilot Assembly 10. Remove the burner Replacing the Self‐Cleaning Burner Solenoid Replacing the Gas Valve SG/SSH Series Service Manual Replacing the Transformer Box 9.Remove the transformer Replacing the DVI Switch Replacing the Burners Replacing the Burner Assembly11. Remove the SCB runner tube Replacing the Burner Assembly SG/SSH Series Service Manual NOTE: For SSH models only Replacing the Frypot7. Remove the flange elbow 14. Remove the splash back by lifting up NOTE: Lifting the tank requires two 2 technicians Replacing the Transformer Replacing the Basket Lift ComponentsRemoving the Basket Lift Cover Replacing the Basket Lift Driver Board Replacing the Basket Lift Actuator Adjusting the Magnetic Sensor5.Remove the top retaining bushing by unscrewing 9. Remove the actuator collar 8. Rotate up the actuator collarGas Conversion mV Model Taking an Incoming Supply Gas Pressure Reading 7 to Taking a Manifold Gas Pressure ReadingSupply Pressure Table Manifold Gas Pressure Table Thermopile mV Table Adjusting the ThermopileMeasuring Thermopile Taking a Millivolt ReadingHi-Limit Thermostat Replacing the Thermostat11. Finger tighten the fitting 9. Apply Teflon paste to the fitting10. Remove and replace the temperature bulb NOTES Calibrating the ThermostatReplacing the Hi‐Limit Thermostat Filter System Replacing the Return Valve Replacing the Flush Hose Assembly and Valve 9. Lift bracket out and slide forward 8. Slide the bracket to the back of the assembly11. Remove the nut using a 7/16 inch wrench piping 14. Remove the piping using a 15/16 inch wrenchon the valve and an adjustable wrench on the 12. Remove the handle1. Disconnect plug from pump box Replacing the Heat TapeRemoving Rear Mounting Bracket Replacing the Waste Oil and ComponentsRemoving the Check Valve 6. Lift off the mounting bracket 7.Remove the valve using two adjustable wrenches4. Remove the valve lever Removing the Filter Pump and Motor Replacing the Filter Pump and Motor8. Remove the bracket Replacing Seal Kit Removing the Filter Pump from the Motor Replacing the Return Switch 11. Pull the red return handle out of the fryer 4.Slide out the drain line Replacing the Drain Line or Gasket3. Slide off the drain manifold gasket 2. Lift off the drain manifold clampReplacing the Circuit Breaker Replacing the Pump Relay and Circuit BreakerReplacing the Pump Relay Troubleshooting and Problem Isolation Interpretation of Solid State Controller Lights Troubleshooting and Problem IsolationSolid State Thermostat Field Calibration Gas Valve Component TroubleshootingRoll Out Switch ProbeIgnition Module Drain Valve and Return Valve SwitchesTransformer Computer Control Relay BoardPrimary Solid State Control Digital Solid State ControlBackup Solid State Control Probe Resistance Chart Main Burner Orifice Size ChartModel Gas TypeOrifice Size Required at Other Elevations Orifice Size at Sea Level ChartWiring Diagrams Wiring Diagram – Full Vat with SCB Simplified Wiring DiagramsWiring Diagram - Twin Vat with SCB Wiring Diagram – Basket Lifts Wiring Diagram – Filter Motor 115V‐60Hz Wiring Diagrams – Filter Motor 208‐240V SG/SSH Series Service Manual L22-345R0 Notes