Pitco Frialator
L22-345
manual
Serial Numbers, SG/SSH Series Service Manual
Troubleshooting
Wiring Diagrams
Accessing Fryer for Servicing
Replacing the Burner Assembly
Adjusting Pilot Pressure
Backup Solid State Control
Safety
Solstice Service Manual
Replacing the DVI Switch
Page 10
Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers
Serial Numbers
SG/SSH Series Service Manual
10
Page 9
Page 11
Image 10
Page 9
Page 11
Contents
High Efficiency Gas Fryers SG/SSH Series
Solstice Service Manual
L22-345R0
SHIPPING ADDRESS
Notice
MAILING ADDRESS
EQUIPMENT REFERENECE INFORMATION
24V Model
Table of Contents
Theory of Operation
mV Model
Troubleshooting and Problem Isolation
Filter System
Wiring Diagrams
Simplified Wiring Diagrams
Theory of Operation
Fryer Components Operation
Heating System
Filter System
Safety System
Optional Basket Lift
Controller Operational Modes
Serial Numbers
24V Model
1. Press off button on control panel
Accessing Fryer for Servicing
4. Unplug all power cords
2. Slide button to solid state
Cleaning the Gas Valve Vent Tube
Checking the Burner Manifold Gas Pressure
Taking a Supply Gas Pressure Reading
Supply Pressure Table
Removing Solid State Thermostat If Necessary
Taking a Manifold Gas Pressure Reading
Adjusting Pilot Pressure
Adjusting Manifold Gas Pressure
Manifold Gas Pressure Table
3.Rotate the knob to point at actual temperature
Calibrating Solid State Thermostat
2.With a 5/16 inch socket, loosen the collet
4.Tighten collet and replace knob cap
Replacing the Controllers and Wiring Harness
Removing the Controller Front Panel Bezel
Removing the Solid State Wiring Harness
6. Remove the controller wiring harness
Replacing the Relay Board and Paper
Replacing the Ignition Module
Replacing the Spinal Tap
8. Disconnect the connection from the valve
Side View of Plugs
Top View of Plugs
Replacing an Igniter/Pilot Assembly
10. Remove the burner
Replacing the Self‐Cleaning Burner Solenoid
Replacing the Gas Valve
SG/SSH Series Service Manual
Replacing the Transformer Box
9.Remove the transformer
Replacing the DVI Switch
Replacing the Burner Assembly
Replacing the Burners
11. Remove the SCB runner tube
Replacing the Burner Assembly
SG/SSH Series Service Manual
Replacing the Frypot
NOTE: For SSH models only
7. Remove the flange elbow
14. Remove the splash back by lifting up
NOTE: Lifting the tank requires two 2 technicians
Removing the Basket Lift Cover
Replacing the Basket Lift Components
Replacing the Transformer
Replacing the Basket Lift Driver Board
Adjusting the Magnetic Sensor
Replacing the Basket Lift Actuator
5.Remove the top retaining bushing by unscrewing
8. Rotate up the actuator collar
9. Remove the actuator collar
Gas Conversion
mV Model
Taking an Incoming Supply Gas Pressure Reading
Supply Pressure Table
Taking a Manifold Gas Pressure Reading
7 to
4. When adjustment is complete
Taking a Millivolt Reading
Adjusting the Thermopile
Measuring Thermopile
Thermopile mV Table
Replacing the Thermostat
Hi-Limit Thermostat
10. Remove and replace the temperature bulb
9. Apply Teflon paste to the fitting
11. Finger tighten the fitting
Calibrating the Thermostat
NOTES
Replacing the Hi‐Limit Thermostat
Filter System
Replacing the Return Valve
Replacing the Flush Hose Assembly and Valve
11. Remove the nut using a 7/16 inch wrench
8. Slide the bracket to the back of the assembly
9. Lift bracket out and slide forward
12. Remove the handle
14. Remove the piping using a 15/16 inch wrench
on the valve and an adjustable wrench on the
piping
Replacing the Heat Tape
1. Disconnect plug from pump box
Replacing the Waste Oil and Components
Removing Rear Mounting Bracket
Removing the Check Valve
4. Remove the valve lever
7.Remove the valve using two adjustable wrenches
6. Lift off the mounting bracket
Replacing the Filter Pump and Motor
Removing the Filter Pump and Motor
8. Remove the bracket
Replacing Seal Kit
Removing the Filter Pump from the Motor
Replacing the Return Switch
11. Pull the red return handle out of the fryer
2. Lift off the drain manifold clamp
Replacing the Drain Line or Gasket
3. Slide off the drain manifold gasket
4.Slide out the drain line
Replacing the Pump Relay and Circuit Breaker
Replacing the Circuit Breaker
Replacing the Pump Relay
Troubleshooting and Problem Isolation
Troubleshooting and Problem Isolation
Interpretation of Solid State Controller Lights
Solid State Thermostat Field Calibration
Probe
Component Troubleshooting
Roll Out Switch
Gas Valve
Transformer
Drain Valve and Return Valve Switches
Ignition Module
Relay Board
Computer Control
Digital Solid State Control
Primary Solid State Control
Backup Solid State Control
Probe Resistance Chart
Gas Type
Orifice Size Chart
Model
Main Burner
Orifice Size at Sea Level Chart
Orifice Size Required at Other Elevations
Wiring Diagrams
Simplified Wiring Diagrams
Wiring Diagram – Full Vat with SCB
Wiring Diagram - Twin Vat with SCB
Wiring Diagram – Basket Lifts
Wiring Diagram – Filter Motor 115V‐60Hz
Wiring Diagrams – Filter Motor 208‐240V
Notes
SG/SSH Series Service Manual L22-345R0
Related pages
All Service page
Loading Cups, Glasses Coffee Services for AEG 33060 I
Reliability, Availability, and Serviceability RAS for Intel SGI Altix 450
Service for IBM Type 7977
Before Calling for Service for LG Electronics LMV1683ST
Service Typical Swap Time Maximum Swap Time for Schneider Electric 840 USE 106 0
Connections to, the BlackBerry Collaboration Service for Blackberry SWD-20120924140022907
Service for Kathrein UFS 821sw
If Service Seems Necessary for Boston Acoustics 635
Service à la clientèle for Hamilton Beach 840152602
Service and Repairs for Porter-Cable DA250B
How do I maintain the blade condition for the Rhino Turbo 96?
Learn more
Top
Page
Image
Contents