Pitco Frialator L22-345 manual Probe Resistance Chart

Page 85
Probe Resistance Chart

Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers

Probe Resistance Chart

Probe Resistance in 5°F Increments.

Probe

Probe

Resistance

 

Temp

Temp

 

(Ohms)

 

(°F)

(°C)

 

 

 

10

-12.2

562734

 

15

-9.4

483875

 

20

-6.7

417167

 

25

-3.9

360589

 

30

-1.1

312474

 

35

1.7

271446

 

40

4.4

236370

 

45

7.2

206311

 

50

10.0

180491

 

55

12.8

158252

 

60

15.6

139055

 

65

18.3

122489

 

70

21.1

108051

 

75

23.9

95539

 

80

26.7

84644

 

85

29.4

75136

 

90

32.2

66823

 

95

35.0

59540

 

100

37.8

53146

 

105

40.6

47523

 

110

43.3

42569

 

115

46.1

38195

 

120

48.9

34328

 

125

51.7

30902

 

130

54.4

27862

 

135

57.2

25161

 

140

60.0

22755

 

145

62.8

20610

 

150

65.6

18695

 

155

68.3

16981

 

160

71.1

15446

 

165

73.9

14069

 

170

76.7

12823

 

Probe

Probe

Resistance

Temp

Temp

(Ohms)

(°F)

(°C)

 

175

79.4

11719

180

82.2

10716

185

85.0

9812

190

87.8

8995

195

90.6

8255

200

93.3

7586

205

96.1

6979

210

98.9

6427

215

101.7

5926

220

104.4

5470

225

107.2

5055

230

110.0

4675

235

112.8

4329

240

115.6

4013

245

118.3

3723

250

121.1

3458

255

123.9

3214

260

126.7

2991

265

129.4

2785

270

132.2

2597

275

135.0

2422

280

137.8

2262

285

140.6

2113.9

290

143.3

1977.3

295

146.1

1851.0

300

148.9

1734.3

305

151.7

1626.1

310

154.4

1525.9

315

157.2

1433.0

320

160.0

1346.7

325

162.8

1266.6

330

165.6

1192.1

335

168.3

1122.8

 

Probe

Probe

Resistance

 

Temp

Temp

 

(Ohms)

 

(°F)

(°C)

 

 

 

340

171.1

1058.23

 

345

173.9

998.09

 

350

176.7

942.00

 

355

179.4

889.67

 

360

182.2

840.78

 

365

185.0

795.10

 

370

187.8

752.38

 

375

190.6

712.41

 

380

193.3

674.95

 

385

196.1

639.87

 

390

198.9

606.96

 

395

201.7

576.09

 

400

204.4

547.09

 

405

207.2

519.86

 

410

210.0

494.24

 

415

212.8

470.16

 

420

215.6

447.49

 

425

218.3

426.13

 

430

221.1

406.02

 

435

223.9

387.04

 

440

226.7

369.14

 

445

229.4

352.24

 

450

232.2

336.29

 

455

235.0

321.21

 

460

237.8

306.94

 

465

240.6

293.46

 

470

243.3

280.69

 

475

246.1

268.61

 

480

248.9

257.15

 

485

251.7

246.30

 

490

254.4

236.00

 

495

257.2

226.24

 

500

260.0

216.96

NOTE: Resistance, of either probe lead, to the frame of the appliance should read as “open’ on the meter. Typically this is 1Meg ohms or more.

°C = 5/9 (°F-32) °F = (9/5 * °C) +32

SG/SSH Series Service Manual

85

Image 85
Contents High Efficiency Gas Fryers SG/SSH Series Solstice Service ManualL22-345R0 MAILING ADDRESS NoticeSHIPPING ADDRESS EQUIPMENT REFERENECE INFORMATION24V Model Table of ContentsTheory of Operation mV Model Troubleshooting and Problem IsolationFilter System Simplified Wiring Diagrams Wiring DiagramsTheory of Operation Heating System Fryer Components OperationFilter System Safety SystemOptional Basket Lift Controller Operational Modes Serial Numbers 24V Model 4. Unplug all power cords Accessing Fryer for Servicing1. Press off button on control panel 2. Slide button to solid stateCleaning the Gas Valve Vent Tube Taking a Supply Gas Pressure Reading Checking the Burner Manifold Gas PressureSupply Pressure Table Removing Solid State Thermostat If Necessary Taking a Manifold Gas Pressure Reading Adjusting Pilot Pressure Adjusting Manifold Gas PressureManifold Gas Pressure Table 2.With a 5/16 inch socket, loosen the collet Calibrating Solid State Thermostat3.Rotate the knob to point at actual temperature 4.Tighten collet and replace knob capRemoving the Controller Front Panel Bezel Replacing the Controllers and Wiring HarnessRemoving the Solid State Wiring Harness 6. Remove the controller wiring harness Replacing the Relay Board and Paper Replacing the Ignition Module Replacing the Spinal Tap 8. Disconnect the connection from the valve Top View of Plugs Side View of PlugsReplacing an Igniter/Pilot Assembly 10. Remove the burner Replacing the Self‐Cleaning Burner Solenoid Replacing the Gas Valve SG/SSH Series Service Manual Replacing the Transformer Box 9.Remove the transformer Replacing the DVI Switch Replacing the Burners Replacing the Burner Assembly11. Remove the SCB runner tube Replacing the Burner Assembly SG/SSH Series Service Manual NOTE: For SSH models only Replacing the Frypot7. Remove the flange elbow 14. Remove the splash back by lifting up NOTE: Lifting the tank requires two 2 technicians Removing the Basket Lift Cover Replacing the Basket Lift ComponentsReplacing the Transformer Replacing the Basket Lift Driver Board Replacing the Basket Lift Actuator Adjusting the Magnetic Sensor5.Remove the top retaining bushing by unscrewing 9. Remove the actuator collar 8. Rotate up the actuator collarGas Conversion mV Model Taking an Incoming Supply Gas Pressure Reading Supply Pressure Table Taking a Manifold Gas Pressure Reading7 to 4. When adjustment is complete Measuring Thermopile Adjusting the ThermopileTaking a Millivolt Reading Thermopile mV TableHi-Limit Thermostat Replacing the Thermostat10. Remove and replace the temperature bulb 9. Apply Teflon paste to the fitting11. Finger tighten the fitting NOTES Calibrating the ThermostatReplacing the Hi‐Limit Thermostat Filter System Replacing the Return Valve Replacing the Flush Hose Assembly and Valve 11. Remove the nut using a 7/16 inch wrench 8. Slide the bracket to the back of the assembly9. Lift bracket out and slide forward on the valve and an adjustable wrench on the 14. Remove the piping using a 15/16 inch wrench12. Remove the handle piping1. Disconnect plug from pump box Replacing the Heat TapeRemoving Rear Mounting Bracket Replacing the Waste Oil and ComponentsRemoving the Check Valve 4. Remove the valve lever 7.Remove the valve using two adjustable wrenches6. Lift off the mounting bracket Removing the Filter Pump and Motor Replacing the Filter Pump and Motor8. Remove the bracket Replacing Seal Kit Removing the Filter Pump from the Motor Replacing the Return Switch 11. Pull the red return handle out of the fryer 3. Slide off the drain manifold gasket Replacing the Drain Line or Gasket2. Lift off the drain manifold clamp 4.Slide out the drain lineReplacing the Circuit Breaker Replacing the Pump Relay and Circuit BreakerReplacing the Pump Relay Troubleshooting and Problem Isolation Interpretation of Solid State Controller Lights Troubleshooting and Problem IsolationSolid State Thermostat Field Calibration Roll Out Switch Component TroubleshootingProbe Gas ValveTransformer Drain Valve and Return Valve SwitchesIgnition Module Computer Control Relay BoardPrimary Solid State Control Digital Solid State ControlBackup Solid State Control Probe Resistance Chart Model Orifice Size ChartGas Type Main BurnerOrifice Size Required at Other Elevations Orifice Size at Sea Level ChartWiring Diagrams Wiring Diagram – Full Vat with SCB Simplified Wiring DiagramsWiring Diagram - Twin Vat with SCB Wiring Diagram – Basket Lifts Wiring Diagram – Filter Motor 115V‐60Hz Wiring Diagrams – Filter Motor 208‐240V SG/SSH Series Service Manual L22-345R0 Notes