Pitco Frialator L22-345 manual Orifice Size at Sea Level Chart

Page 87
Orifice Size at Sea Level Chart

Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers

Orifice Size at Sea Level Chart

Orifice

 

 

Orifice Size Required at Other Elevations

 

 

Size at

 

 

 

 

 

 

 

 

 

 

 

 

 

Sea

 

 

 

 

 

 

 

 

 

Level

2000

3000

4000

5000

6000

7000

8000

9000

10,000

30

30

31

31

31

31

32

32

33

35

31

32

32

32

33

34

35

36

37

38

32

33

34

35

35

36

36

37

38

40

33

35

35

36

36

37

38

38

40

41

34

35

36

36

37

37

38

39

40

42

35

36

36

37

37

38

39

40

41

42

36

37

38

38

39

40

41

41

42

43

37

38

39

39

40

41

42

42

43

43

38

39

40

41

41

42

42

43

43

44

39

40

41

41

42

42

43

43

44

44

40

41

42

42

42

43

43

44

44

45

41

42

42

42

43

43

44

44

45

46

42

42

43

43

43

44

44

45

46

47

43

44

44

44

45

45

46

47

47

48

44

45

45

45

46

47

47

48

48

49

45

46

47

47

47

48

48

49

49

50

46

47

47

47

48

48

49

49

50

50

47

48

48

49

49

49

50

50

51

51

48

49

49

49

50

50

50

51

51

52

49

50

50

50

51

51

51

52

52

52

50

51

51

51

51

52

52

52

53

53

51

51

52

52

52

52

53

53

53

54

52

52

53

53

53

53

53

54

54

54

0.062

0.062

53

53

53

53

53

54

54

54

53

54

54

54

54

54

54

55

55

55

54

54

55

55

55

55

55

56

56

56

55

55

55

55

56

56

56

56

56

57

56

56

56

57

57

57

58

59

59

60

57

58

59

59

60

60

61

62

63

63

58

59

60

60

61

62

62

63

63

64

59

60

61

61

62

62

63

64

64

65

60

61

61

62

63

63

64

64

65

65

SG/SSH Series Service Manual

87

Image 87
Contents Solstice Service Manual High Efficiency Gas Fryers SG/SSH SeriesL22-345R0 EQUIPMENT REFERENECE INFORMATION NoticeMAILING ADDRESS SHIPPING ADDRESSTable of Contents 24V ModelTheory of Operation Troubleshooting and Problem Isolation mV ModelFilter System Simplified Wiring Diagrams Wiring DiagramsTheory of Operation Heating System Fryer Components OperationSafety System Filter SystemOptional Basket Lift Controller Operational Modes Serial Numbers 24V Model 2. Slide button to solid state Accessing Fryer for Servicing4. Unplug all power cords 1. Press off button on control panelCleaning the Gas Valve Vent Tube Taking a Supply Gas Pressure Reading Checking the Burner Manifold Gas PressureSupply Pressure Table Removing Solid State Thermostat If Necessary Taking a Manifold Gas Pressure Reading Adjusting Manifold Gas Pressure Adjusting Pilot PressureManifold Gas Pressure Table 4.Tighten collet and replace knob cap Calibrating Solid State Thermostat2.With a 5/16 inch socket, loosen the collet 3.Rotate the knob to point at actual temperatureRemoving the Controller Front Panel Bezel Replacing the Controllers and Wiring HarnessRemoving the Solid State Wiring Harness 6. Remove the controller wiring harness Replacing the Relay Board and Paper Replacing the Ignition Module Replacing the Spinal Tap 8. Disconnect the connection from the valve Top View of Plugs Side View of PlugsReplacing an Igniter/Pilot Assembly 10. Remove the burner Replacing the Self‐Cleaning Burner Solenoid Replacing the Gas Valve SG/SSH Series Service Manual Replacing the Transformer Box 9.Remove the transformer Replacing the DVI Switch Replacing the Burners Replacing the Burner Assembly11. Remove the SCB runner tube Replacing the Burner Assembly SG/SSH Series Service Manual NOTE: For SSH models only Replacing the Frypot7. Remove the flange elbow 14. Remove the splash back by lifting up NOTE: Lifting the tank requires two 2 technicians Replacing the Basket Lift Components Removing the Basket Lift CoverReplacing the Transformer Replacing the Basket Lift Driver Board Replacing the Basket Lift Actuator Adjusting the Magnetic Sensor5.Remove the top retaining bushing by unscrewing 9. Remove the actuator collar 8. Rotate up the actuator collarGas Conversion mV Model Taking an Incoming Supply Gas Pressure Reading Taking a Manifold Gas Pressure Reading Supply Pressure Table7 to Adjusting Manifold Gas Pressure Thermopile mV Table Adjusting the ThermopileMeasuring Thermopile Taking a Millivolt ReadingHi-Limit Thermostat Replacing the Thermostat9. Apply Teflon paste to the fitting 10. Remove and replace the temperature bulb11. Finger tighten the fitting NOTES Calibrating the ThermostatReplacing the Hi‐Limit Thermostat Filter System Replacing the Return Valve Replacing the Flush Hose Assembly and Valve 8. Slide the bracket to the back of the assembly 11. Remove the nut using a 7/16 inch wrench9. Lift bracket out and slide forward piping 14. Remove the piping using a 15/16 inch wrenchon the valve and an adjustable wrench on the 12. Remove the handle1. Disconnect plug from pump box Replacing the Heat TapeRemoving Rear Mounting Bracket Replacing the Waste Oil and ComponentsRemoving the Check Valve 7.Remove the valve using two adjustable wrenches 4. Remove the valve lever6. Lift off the mounting bracket Removing the Filter Pump and Motor Replacing the Filter Pump and Motor8. Remove the bracket Replacing Seal Kit Removing the Filter Pump from the Motor Replacing the Return Switch 11. Pull the red return handle out of the fryer 4.Slide out the drain line Replacing the Drain Line or Gasket3. Slide off the drain manifold gasket 2. Lift off the drain manifold clampReplacing the Circuit Breaker Replacing the Pump Relay and Circuit BreakerReplacing the Pump Relay Troubleshooting and Problem Isolation Interpretation of Solid State Controller Lights Troubleshooting and Problem IsolationSolid State Thermostat Field Calibration Gas Valve Component TroubleshootingRoll Out Switch ProbeDrain Valve and Return Valve Switches TransformerIgnition Module Computer Control Relay BoardPrimary Solid State Control Digital Solid State ControlBackup Solid State Control Probe Resistance Chart Main Burner Orifice Size ChartModel Gas TypeOrifice Size Required at Other Elevations Orifice Size at Sea Level ChartWiring Diagrams Wiring Diagram – Full Vat with SCB Simplified Wiring DiagramsWiring Diagram - Twin Vat with SCB Wiring Diagram – Basket Lifts Wiring Diagram – Filter Motor 115V‐60Hz Wiring Diagrams – Filter Motor 208‐240V SG/SSH Series Service Manual L22-345R0 Notes