Pitco Frialator
L22-345 Wiring Diagram – Filter Motor 115V‐60Hz, SG/SSH Series Service Manual
Troubleshooting
Wiring Diagrams
Accessing Fryer for Servicing
Replacing the Burner Assembly
Adjusting Pilot Pressure
Backup Solid State Control
Safety
Solstice Service Manual
Replacing the DVI Switch
Page 92
Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers
Wiring Diagram – Filter Motor 115V‐60Hz
SG/SSH Series Service Manual
92
Page 91
Page 93
Image 92
Page 91
Page 93
Contents
L22-345R0
Solstice Service Manual
High Efficiency Gas Fryers SG/SSH Series
Notice
MAILING ADDRESS
SHIPPING ADDRESS
EQUIPMENT REFERENECE INFORMATION
Theory of Operation
Table of Contents
24V Model
Filter System
Troubleshooting and Problem Isolation
mV Model
Wiring Diagrams
Simplified Wiring Diagrams
Theory of Operation
Fryer Components Operation
Heating System
Optional Basket Lift
Safety System
Filter System
Controller Operational Modes
Serial Numbers
24V Model
Accessing Fryer for Servicing
4. Unplug all power cords
1. Press off button on control panel
2. Slide button to solid state
Cleaning the Gas Valve Vent Tube
Checking the Burner Manifold Gas Pressure
Taking a Supply Gas Pressure Reading
Supply Pressure Table
Removing Solid State Thermostat If Necessary
Taking a Manifold Gas Pressure Reading
Manifold Gas Pressure Table
Adjusting Manifold Gas Pressure
Adjusting Pilot Pressure
Calibrating Solid State Thermostat
2.With a 5/16 inch socket, loosen the collet
3.Rotate the knob to point at actual temperature
4.Tighten collet and replace knob cap
Replacing the Controllers and Wiring Harness
Removing the Controller Front Panel Bezel
Removing the Solid State Wiring Harness
6. Remove the controller wiring harness
Replacing the Relay Board and Paper
Replacing the Ignition Module
Replacing the Spinal Tap
8. Disconnect the connection from the valve
Side View of Plugs
Top View of Plugs
Replacing an Igniter/Pilot Assembly
10. Remove the burner
Replacing the Self‐Cleaning Burner Solenoid
Replacing the Gas Valve
SG/SSH Series Service Manual
Replacing the Transformer Box
9.Remove the transformer
Replacing the DVI Switch
Replacing the Burner Assembly
Replacing the Burners
11. Remove the SCB runner tube
Replacing the Burner Assembly
SG/SSH Series Service Manual
Replacing the Frypot
NOTE: For SSH models only
7. Remove the flange elbow
14. Remove the splash back by lifting up
NOTE: Lifting the tank requires two 2 technicians
Replacing the Transformer
Replacing the Basket Lift Components
Removing the Basket Lift Cover
Replacing the Basket Lift Driver Board
Adjusting the Magnetic Sensor
Replacing the Basket Lift Actuator
5.Remove the top retaining bushing by unscrewing
8. Rotate up the actuator collar
9. Remove the actuator collar
Gas Conversion
mV Model
Taking an Incoming Supply Gas Pressure Reading
7 to
Taking a Manifold Gas Pressure Reading
Supply Pressure Table
Manifold Gas Pressure Table
Adjusting the Thermopile
Measuring Thermopile
Taking a Millivolt Reading
Thermopile mV Table
Replacing the Thermostat
Hi-Limit Thermostat
11. Finger tighten the fitting
9. Apply Teflon paste to the fitting
10. Remove and replace the temperature bulb
Calibrating the Thermostat
NOTES
Replacing the Hi‐Limit Thermostat
Filter System
Replacing the Return Valve
Replacing the Flush Hose Assembly and Valve
9. Lift bracket out and slide forward
8. Slide the bracket to the back of the assembly
11. Remove the nut using a 7/16 inch wrench
14. Remove the piping using a 15/16 inch wrench
on the valve and an adjustable wrench on the
12. Remove the handle
piping
Replacing the Heat Tape
1. Disconnect plug from pump box
Replacing the Waste Oil and Components
Removing Rear Mounting Bracket
Removing the Check Valve
6. Lift off the mounting bracket
7.Remove the valve using two adjustable wrenches
4. Remove the valve lever
Replacing the Filter Pump and Motor
Removing the Filter Pump and Motor
8. Remove the bracket
Replacing Seal Kit
Removing the Filter Pump from the Motor
Replacing the Return Switch
11. Pull the red return handle out of the fryer
Replacing the Drain Line or Gasket
3. Slide off the drain manifold gasket
2. Lift off the drain manifold clamp
4.Slide out the drain line
Replacing the Pump Relay and Circuit Breaker
Replacing the Circuit Breaker
Replacing the Pump Relay
Troubleshooting and Problem Isolation
Troubleshooting and Problem Isolation
Interpretation of Solid State Controller Lights
Solid State Thermostat Field Calibration
Component Troubleshooting
Roll Out Switch
Probe
Gas Valve
Ignition Module
Drain Valve and Return Valve Switches
Transformer
Relay Board
Computer Control
Digital Solid State Control
Primary Solid State Control
Backup Solid State Control
Probe Resistance Chart
Orifice Size Chart
Model
Gas Type
Main Burner
Orifice Size at Sea Level Chart
Orifice Size Required at Other Elevations
Wiring Diagrams
Simplified Wiring Diagrams
Wiring Diagram – Full Vat with SCB
Wiring Diagram - Twin Vat with SCB
Wiring Diagram – Basket Lifts
Wiring Diagram – Filter Motor 115V‐60Hz
Wiring Diagrams – Filter Motor 208‐240V
Notes
SG/SSH Series Service Manual L22-345R0
Related pages
All Diagram page
G0673 Wiring Diagram for Grizzly G0673
Heat Pump Single Compressor Wiring Diagram for Trane SSP-PRC001-EN
Thaw and Serve Chart for Jenn-Air 8112P212-60
Wiring Diagram for Avanti WC30SSR
Schematic Entire Machine L6518 for Lincoln Electric SVM176-A
Diagram #3 for JVC AV 65WP74
Diagrama de piezas for Dremel 220
Interference Eliminator Code Chart for Motorola 6880906Z72-O
Bus Arbitration Timing Diagram for Motorola MC68030
What is the
genie fault code list
?
Top
Page
Image
Contents