Drain Valve and Return Valve Switches

Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers

Drain Valve and Return Valve Switches

These switches are a magnetically operated proximity switches. When the drain valve handle is moved to the open position, the actuator moves away from the switch causing the switch to open. When the drain valve is closed, the switch closes.

Opening the RED return valve handle closes the proximity switch causing the “pump on” relay to be energized; the pump begins to pump. Closing the return valve handle opens the proximity switch causing the relay to de- energize and the pump to stop pumping. These switches can be checked with a Ω meter. When the switch is closed, there should be continuity. The normal gap between the actuator and the sensor switch on the valve handle is 1/8 inch to 1/4 inch (3 mm to 6 mm).

Transformer

The transformer is a multiple AC input voltage and 24 VAC output voltage. It can be checked by reading the input and output voltages. A quick check for 24 VAC is done at the relay board behind the front panel. The AC indicator is illuminated if the F1 fuse is good and the board is receiving 24 VAC.

Ignition Module

With a 24 VAC input at pin #6, the ignition module has a 24 VAC output from terminal 3(PV) and the igniter sparks until the module senses the pilot flame or for approximately 90 seconds at which time the module locks out, whichever occurs first. When the module has proven the pilot flame, it has a 24 VAC output at terminal 1(MV) and put 24 VAC to pin 2 at connection J/P32 on the relay board. The relay board interrupts the 24 VAC to the gas valve until the controller calls for heat.

NOTE: When the controller is on, the pilot should always remain lit.

SG/SSH Series Service Manual

81

Image 81
Contents Solstice Service Manual High Efficiency Gas Fryers SG/SSH SeriesL22-345R0 MAILING ADDRESS NoticeSHIPPING ADDRESS EQUIPMENT REFERENECE INFORMATIONTable of Contents 24V ModelTheory of Operation Troubleshooting and Problem Isolation mV ModelFilter System Simplified Wiring Diagrams Wiring DiagramsTheory of Operation Heating System Fryer Components OperationSafety System Filter SystemOptional Basket Lift Controller Operational Modes Serial Numbers 24V Model 4. Unplug all power cords Accessing Fryer for Servicing1. Press off button on control panel 2. Slide button to solid stateCleaning the Gas Valve Vent Tube Taking a Supply Gas Pressure Reading Checking the Burner Manifold Gas PressureSupply Pressure Table Removing Solid State Thermostat If Necessary Taking a Manifold Gas Pressure Reading Adjusting Manifold Gas Pressure Adjusting Pilot PressureManifold Gas Pressure Table 2.With a 5/16 inch socket, loosen the collet Calibrating Solid State Thermostat3.Rotate the knob to point at actual temperature 4.Tighten collet and replace knob capRemoving the Controller Front Panel Bezel Replacing the Controllers and Wiring HarnessRemoving the Solid State Wiring Harness 6. Remove the controller wiring harness Replacing the Relay Board and Paper Replacing the Ignition Module Replacing the Spinal Tap 8. Disconnect the connection from the valve Top View of Plugs Side View of PlugsReplacing an Igniter/Pilot Assembly 10. Remove the burner Replacing the Self‐Cleaning Burner Solenoid Replacing the Gas Valve SG/SSH Series Service Manual Replacing the Transformer Box 9.Remove the transformer Replacing the DVI Switch Replacing the Burners Replacing the Burner Assembly11. Remove the SCB runner tube Replacing the Burner Assembly SG/SSH Series Service Manual NOTE: For SSH models only Replacing the Frypot7. Remove the flange elbow 14. Remove the splash back by lifting up NOTE: Lifting the tank requires two 2 technicians Replacing the Basket Lift Components Removing the Basket Lift CoverReplacing the Transformer Replacing the Basket Lift Driver Board Replacing the Basket Lift Actuator Adjusting the Magnetic Sensor5.Remove the top retaining bushing by unscrewing 9. Remove the actuator collar 8. Rotate up the actuator collarGas Conversion mV Model Taking an Incoming Supply Gas Pressure Reading Taking a Manifold Gas Pressure Reading Supply Pressure Table7 to Adjusting Manifold Gas Pressure Measuring Thermopile Adjusting the ThermopileTaking a Millivolt Reading Thermopile mV TableHi-Limit Thermostat Replacing the Thermostat9. Apply Teflon paste to the fitting 10. Remove and replace the temperature bulb11. Finger tighten the fitting NOTES Calibrating the ThermostatReplacing the Hi‐Limit Thermostat Filter System Replacing the Return Valve Replacing the Flush Hose Assembly and Valve 8. Slide the bracket to the back of the assembly 11. Remove the nut using a 7/16 inch wrench9. Lift bracket out and slide forward on the valve and an adjustable wrench on the 14. Remove the piping using a 15/16 inch wrench12. Remove the handle piping1. Disconnect plug from pump box Replacing the Heat TapeRemoving Rear Mounting Bracket Replacing the Waste Oil and ComponentsRemoving the Check Valve 7.Remove the valve using two adjustable wrenches 4. Remove the valve lever6. Lift off the mounting bracket Removing the Filter Pump and Motor Replacing the Filter Pump and Motor8. Remove the bracket Replacing Seal Kit Removing the Filter Pump from the Motor Replacing the Return Switch 11. Pull the red return handle out of the fryer 3. Slide off the drain manifold gasket Replacing the Drain Line or Gasket2. Lift off the drain manifold clamp 4.Slide out the drain lineReplacing the Circuit Breaker Replacing the Pump Relay and Circuit BreakerReplacing the Pump Relay Troubleshooting and Problem Isolation Interpretation of Solid State Controller Lights Troubleshooting and Problem IsolationSolid State Thermostat Field Calibration Roll Out Switch Component TroubleshootingProbe Gas ValveDrain Valve and Return Valve Switches TransformerIgnition Module Computer Control Relay BoardPrimary Solid State Control Digital Solid State ControlBackup Solid State Control Probe Resistance Chart Model Orifice Size ChartGas Type Main BurnerOrifice Size Required at Other Elevations Orifice Size at Sea Level ChartWiring Diagrams Wiring Diagram – Full Vat with SCB Simplified Wiring DiagramsWiring Diagram - Twin Vat with SCB Wiring Diagram – Basket Lifts Wiring Diagram – Filter Motor 115V‐60Hz Wiring Diagrams – Filter Motor 208‐240V SG/SSH Series Service Manual L22-345R0 Notes