American Panel AP40BC250-2-12, BCCP-1, BCIP, BCCP-2, AP40BC250-12 manual Operating

Page 33
Manual background

OPERATING

Press Manual background to exit the defrost cycle.

F.2.4. UV Cycle

Make sure the unit is on and the display shows:

The controller asks the operator to choose an operating cycle. Choose between automatic, manual, defrost, UV, and print cycle. To start the UV cycle press Manual background.

Press Manual background to start the cycle.

The controller will display the remaining time of the cycle.

At the end of the cycle the controller will beep and display the message:

Press Manual background to exit the UV cycle.

F.2.5. Print Cycle

The controller asks the operator to choose an operating cycle. Choose between automatic, manual, defrost, UV, and print cycle. To start the print cycle press Manual background.

The controller’s memory can store 250 events. The number of readings left show how many more events can still be stored.

Press Manual background to start the cycle.

Note: If the reading is “0”, the memory is full and should be either printed out or erased. A reading of “250” indicates that the memory is empty.

During the printing cycle the controller will display:

At the end of the cycle the controller will beep and display the message:

Press Manual background to exit the print cycle.

31

Image 33
Contents American Panel Corporation E-mail service@americanpanel.com5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352 REV. C“Our reputation rests on the steadfast pursuit of your satisfaction” 5800 S.E. 78 th Street, Ocala, Florida Phone 352 245-7055 Fax 352Index INDEXA. Introduction INTRODUCTIONCONTROLLER B. Installation INSTALLATIONB.2. Single Unit Installation AP40BC250-12 And BCCP-1 INSTALLATION PHOTO #2 DRAWING # PHOTO #3 B.2.3. Electrical Connections PLUG/CONNECTOR COLOR CODE CHARTPLUG/CONNECTOR DESTINATION CABLE/WIREPHOTO #4 PHOTO #5 PHOTO #6 PHOTO #8 PHOTO #7 Door magnetic switch on the left Magnet on the rightC. Refrigeration Unit Installation i CABINETii AIR COOLED electrical power supplies FIG # CONDENSATE DRAINAGE CONNECTION VERIFYING CORRECT INSTALLATIOND. Programming The Controller WARNINGS PROGRAMMINGPREPARATION Automatic ModeD.3. Programming Modes a three button combination using , , , , . For example, press PROGRAMMING PROGRAMMING PROGRAMMING PROGRAMMING D.5.4. Parameter Programming For UV Cycle The Parameter Programming is now complete E. Printer Optional PROGRAMMING F. Operating And Maintaining The Unit OPERATINGPanning Loadingair temperature screen The food temperature screenair temperature screen the food temperature screenOPERATING F.2.6. Error Messages And Troubleshooting Daily Cleaning MAINTENANCEPreventive Maintenance As needed Warningscontractor. It is not covered by this Warranty WARRANTYAppendixes APPENDIXESAUTO MANUALAppendix 2 Electrical Schematic Appendix 3 Electrical Schematic Part DescriptionNumber Appendix 5 Ordering Printer Supplies Ribbon & Paper ƒ Click on Sales & Service ƒ Click on Dealer LocatorE-mail service@americanpanel.com American Panel Corporation5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352