INSTALLATION
electrical power supplies.
Each wire must be connected to its corresponding terminal.
The ground wire must be connected to an efficient ground terminal.
C.3. Refrigeration Lines Installation
Follow the steps below to assure a proper installation.
1. Minimum pipe inclination has to be provided.
CONDENSING UNIT
2. Make sure you place the fastening brackets on insulated piping.
3. Provide air tight welding.
4. Create the vacuum and load the line.
5.Check for leaks.
6.Open the
7.Check the exact load of refrigerant in the liquid passage gauge.
8.Check that all the refrigerant taps are open.
Use the table below to determine the number of pipe supports you need to install.
14