American Panel BCIP, BCCP-1, BCCP-2, AP40BC250-2-12 manual Installation, electrical power supplies

Page 16
electrical power supplies.

INSTALLATION

electrical power supplies.

Each wire must be connected to its corresponding terminal.

The ground wire must be connected to an efficient ground terminal.

C.3. Refrigeration Lines Installation

Follow the steps below to assure a proper installation.

1. Minimum pipe inclination has to be provided.

CONDENSING UNIT

2. Make sure you place the fastening brackets on insulated piping.

3. Provide air tight welding.

4. Create the vacuum and load the line.

5.Check for leaks.

6.Open the shut-off valves (A & B) on both sides of remote unit and of cabinet.

7.Check the exact load of refrigerant in the liquid passage gauge.

8.Check that all the refrigerant taps are open.

Use the table below to determine the number of pipe supports you need to install.

14

Image 16
Contents E-mail service@americanpanel.com American Panel Corporation5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352 REV. C5800 S.E. 78 th Street, Ocala, Florida Phone 352 245-7055 Fax 352 “Our reputation rests on the steadfast pursuit of your satisfaction”INDEX IndexINTRODUCTION A. IntroductionCONTROLLER INSTALLATION B. InstallationB.2. Single Unit Installation AP40BC250-12 And BCCP-1 INSTALLATION PHOTO #2 DRAWING # PHOTO #3 B.2.3. Electrical Connections COLOR CODE CHART PLUG/CONNECTORPLUG/CONNECTOR DESTINATION CABLE/WIREPHOTO #4 PHOTO #5 PHOTO #6 PHOTO #7 Door magnetic switch on the left Magnet on the right PHOTO #8i CABINET C. Refrigeration Unit Installationii AIR COOLED electrical power supplies FIG # VERIFYING CORRECT INSTALLATION CONDENSATE DRAINAGE CONNECTIONPROGRAMMING D. Programming The Controller WARNINGSPREPARATION Automatic ModeD.3. Programming Modes a three button combination using , , , , . For example, press PROGRAMMING PROGRAMMING PROGRAMMING PROGRAMMING D.5.4. Parameter Programming For UV Cycle The Parameter Programming is now complete E. Printer Optional PROGRAMMING OPERATING F. Operating And Maintaining The UnitPanning LoadingThe food temperature screen air temperature screenthe food temperature screen air temperature screenOPERATING F.2.6. Error Messages And Troubleshooting MAINTENANCE Daily CleaningPreventive Maintenance As needed WarningsWARRANTY contractor. It is not covered by this WarrantyAPPENDIXES AppendixesAUTO MANUALAppendix 2 Electrical Schematic Appendix 3 Electrical Schematic Description PartNumber ƒ Click on Sales & Service ƒ Click on Dealer Locator Appendix 5 Ordering Printer Supplies Ribbon & PaperAmerican Panel Corporation E-mail service@americanpanel.com5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352