American Panel BCCP-1, BCIP, BCCP-2 F. Operating And Maintaining The Unit, Panning, Loading

Page 30
OPERATING

OPERATING

F. Operating And Maintaining The Unit

F.1. Panning And Loading

Panning

1.Standard pan depth is 2-1/2”. Other depths can be used but are not recommended as their use would require an increase in the cycle time.

2.Stainless steel or aluminum pans are recommended. Plastic containers will increase the chilling time by 10%.

3.Crockery or stainless cylinders, 6”dia. and 10” max. height, are acceptable.

4.Slack filled cryovac bags can be used if placed on wire shelves.

5.Most foods should be covered with stainless steel or aluminum lids, or with aluminum foil. The food should NOT touch the lid or foil. Avoid plastic wrap when possible as it increases the chilling time by 10%. If it must be used, such as with tomatoes or other high acid foods, leave the wrap slack so that it touches the food surface and pierce it in several places. Plastic oven bags should also be pierced.

6.Foods should be left UNCOVERED in the following circumstances:

When a dry surface is desired, such as with fried chicken, fish or potatoes.

When the food has a relatively large surface, such as with chicken breasts, Salisbury steaks, etc.

For large roasts of beef, turkey, etc.

For pastry and other bakery products.

7.Some foods, such as roast beef, will continue to cook after removal from the oven. To avoid this, they should be chilled uncovered.

8.Food probes should be in the center of the food in the pan.

9.Always wipe the probe with an alcohol swab after removing it from the food, then place the probe into the holding device.

Loading

1.Place the pans on the mobile cart so that the pan ends will face the fans and the cold air will be drawn over the length of the pans.

2.The shelves should be loaded so that there is no less than one inch between the bottom of one pan and the top of the next. Also be certain that there is sufficient space between the top of any probe and the bottom of the pan above.

3.Place the loaded cart in the center of the chilling cabinet between the refrigeration coil and the fans.

28

Image 30
Contents 5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352 E-mail service@americanpanel.comAmerican Panel Corporation REV. C5800 S.E. 78 th Street, Ocala, Florida Phone 352 245-7055 Fax 352 “Our reputation rests on the steadfast pursuit of your satisfaction”INDEX IndexINTRODUCTION A. IntroductionCONTROLLER INSTALLATION B. InstallationB.2. Single Unit Installation AP40BC250-12 And BCCP-1 INSTALLATION PHOTO #2 DRAWING # PHOTO #3 B.2.3. Electrical Connections PLUG/CONNECTOR DESTINATION COLOR CODE CHARTPLUG/CONNECTOR CABLE/WIREPHOTO #4 PHOTO #5 PHOTO #6 PHOTO #7 Door magnetic switch on the left Magnet on the right PHOTO #8C. Refrigeration Unit Installation i CABINETii AIR COOLED electrical power supplies FIG # VERIFYING CORRECT INSTALLATION CONDENSATE DRAINAGE CONNECTIONPREPARATION PROGRAMMINGD. Programming The Controller WARNINGS Automatic ModeD.3. Programming Modes a three button combination using , , , , . For example, press PROGRAMMING PROGRAMMING PROGRAMMING PROGRAMMING D.5.4. Parameter Programming For UV Cycle The Parameter Programming is now complete E. Printer Optional PROGRAMMING Panning OPERATINGF. Operating And Maintaining The Unit LoadingThe food temperature screen air temperature screenthe food temperature screen air temperature screenOPERATING F.2.6. Error Messages And Troubleshooting Preventive Maintenance As needed MAINTENANCEDaily Cleaning WarningsWARRANTY contractor. It is not covered by this WarrantyAUTO APPENDIXESAppendixes MANUALAppendix 2 Electrical Schematic Appendix 3 Electrical Schematic Part DescriptionNumber ƒ Click on Sales & Service ƒ Click on Dealer Locator Appendix 5 Ordering Printer Supplies Ribbon & PaperE-mail service@americanpanel.com American Panel Corporation5800 S.E. 78th Street, Ocala, Florida Phone 352 245-7055 Fax 352