Woods Equipment S105Q-3, S106-3, S106Q-3, S105-3 manual Owner Service, Lubrication

Page 17

OWNER SERVICE

The information in this section is written for operators who possess basic mechanical skills. If you need help, your dealer has trained service technicians available. For your protection, read and follow the safety informa- tion in this manual.

For service and adjustments, lower center frame and cutter head to ground and disconnect cutter driveline from tractor PTO. Raise as needed for working room and securely block all sections of this equipment before working underneath. Block- ing up prevents cutter dropping from hydraulic leak down, hydraulic system failures, or mechani- cal component failures.

When transporting the machine or working on the underside, attach lock-up bar as shown on page 16.

Make sure shields and guards are properly installed and in good condition. Replace if damaged.

Do not disconnect hydraulic lines until machine is securely blocked or placed in lowest position and system pressure is released by operating valve levers.

Operate tractor PTO at 540 RPM (1000 RPM on Q Series cutters). Do not exceed.

CAUTION

Always wear relatively tight and belted clothing to avoid getting caught in moving parts. Wear sturdy, rough-soled work shoes and protective equipment for eyes, hair, hands, hearing, and head; and respirator or filter mask where appropriate.

LUBRICATION

Lower cutter head to ground, shut off tractor engine and remove key before servicing.

Do not let excess grease collect on or around parts, particularly when operating in sandy areas.

Figure 3 shows the lubrication points. The chart gives the frequency in operating hours based on normal operating conditions. Severe or unusual conditions may require more frequent lubrication. Some reference numbers have more than one location; be sure to check number of points.

Use an SAE multi-purpose type grease. Be sure to clean fitting thoroughly before using grease gun.

Use a good quality 90W gear lube in gearboxes.

REF

DESCRIPTION

FREQUENCY

1

Tailwheel

Daily

2

Tailwheel Pivot

Daily

3

Gauge Wheels

Daily

4

U-Joint

10 Hours

5

PTO Shaft (Lube all 4

10 Hours

 

sides)

 

6

PTO Cross Shaft

10 Hours

7

Gearbox (1/2 full of 90W

10 Hours

 

gear lube)

 

8

Bearing Blocks (one pump

24 Hours

 

w/grease gun)

 

9

Lift Pivot Bushing (oil)

Daily

Figure 3. Lubrication Points

29977 (Rev. 1/23/2009)

Owner Service 17

 

 

Image 17
Contents Ditch Bank Rotary Cutter To the Dealer IntroductionTable of Contents General Information SpecificationsSafety Free Mower Safety VideoTraining Package for Rotary Mowers/Cutters-English/Spanish Training Package for Rotary Mowers/Cutters-EnglishInstallation Safety RulesTraining PreparationOperation TransportationStorage MaintenanceReplace Immediately If Damaged Safety & Instructional DecalsSafety Decals from previous Be Careful Operation OperationGeneral Tractor Requirements Tractor Front END StabilitySide Skid Adjustment Cutting Height Attitude AdjustmentOptional Tailwheel Adjustment Attaching Cutter to TractorBlade Selection General MowingCutter Head Hydraulic Lift Tractor and Cutter OperationTransport Brush and Ditch Bank MowingLubrication Owner ServiceOwner Service Slip Clutch Adjustment Blade InstallationBlade Servicing Blade RemovalChain Shielding Repair CleaningAfter Each Use Periodically or Before Extended StorageTrouble Shooting Trouble ShootingDealer Service Dealer ServiceGearbox Maintenance Seal InstallationCrossbar Shimming InstallationDealer Service Universal Joint Repair Joint DisassemblyJoint Assembly SPOOL, 3-WAY Valve SPRING-LOADED Wheel Yoke AdjustmentOpen-Center or Closed-Center OperationDealer Check Lists Dealer Check ListPRE-DELIVERY Check List Delivery CheckAssembly AssemblyDrive Shaft Installation DP1Lift Link Installation Lift Cylinder InstallationMounting A-Frame on Center Frame Attaching Cutter Head to Center FrameCutter Head Gearbox Shield Installation Side Drive Installation FigureSide Shield Installation Chain Shielding Installation Tire and Skid Assembly InstallationCheck Chain Installation Counterweight Installation OptionalStump Jumper Optional Control Valve Installation OptionalTailwheel Optional Assembly Parts Parts IndexCenter Section Assembly Hardware Cutter Head Section Assembly Early S106-3 Tubular Side Drive Assembly Cutter Head Gearbox Assembly Input Gearbox Assembly Standard Drive Front Half of 2-JOINT Drive 35RSlip Clutch Assembly Joint Shielding Plastic Used on Later Machines Integral U-JOINT Shielding Used on Earlier MachinesPart QTY Description 2 Bore & 8 Stroke Hydraulic CylinderPiston SPOOL, 3-WAY Valve Optional Pneumatic Tailwheel Assembly HUB Assembly for Pneumatic Tailwheel Pneumatic Tire Assembly for TailwheelTailwheel Assembly Standard 1 Shaft Heavy-Duty 1-1/4 Shaft Tailwheel & Gauge Wheel AssemblyGauge Wheel & Tailwheel HUB & Axle Assembly Stump Jumper Optional Crossbar Puller AssemblySAE Series Torque Chart Bolt Torque ChartAppendix Metric SeriesAbbreviations Bolt Size ChartIndex IndexWarranty South Illinois Route Post Office Box Oregon, Illinois