Woods Equipment S105Q-3, S106-3, S106Q-3 manual Integral U-JOINT Shielding Used on Earlier Machines

Page 45

INTEGRAL U-JOINT SHIELDING (USED ON EARLIER MACHINES)

STANDARD DRIVE

REF

PART

QTY

DESCRIPTION

1

24441

1

Integral U-joint shield kit, standard

2

7398

2

Integral shield snap ring

3

4677

2

Nylon rectangular groove bearing 35R

4

24443

1

U-Joint outer shield 10"

5

24442

1

U-Joint inner shield 9"

 

 

 

LONG DRIVE

REF

PART

QTY

DESCRIPTION

1

24444

1

Integral shield kit

2

7398

2

Integral shield snap ring

3

4677

2

Nylon rectangular groove bearing 35R

4

24443

1

U-Joint outer shield 10"

5

4919

1

Inner shield 35R

U-JOINT SHIELDING (PLASTIC) (USED ON LATER MACHINES)

 

REF

PART

QTY

DESCRIPTION

4

1

1007870

1

Shield kit, plastic

1

2

1007871

1

Outer shield, 3.00 x 2.81 x 38.0

3

3

1007872

1

Inner shield, 2.75 x 2.56 x 43.3

 

 

4

15740

2

Shield bearing

2

NOTE: Shield

halves must be cut to length. See

 

Assembly Section page 29 for procedures.

4

CD6906

29977 (Rev. 1/23/2009)

Parts 45

 

 

Image 45
Contents Ditch Bank Rotary Cutter To the Dealer IntroductionTable of Contents General Information SpecificationsSafety Free Mower Safety VideoTraining Package for Rotary Mowers/Cutters-English/Spanish Training Package for Rotary Mowers/Cutters-EnglishInstallation Safety RulesTraining PreparationOperation TransportationStorage MaintenanceReplace Immediately If Damaged Safety & Instructional DecalsSafety Decals from previous Be Careful Operation OperationGeneral Tractor Requirements Tractor Front END StabilitySide Skid Adjustment Cutting Height Attitude AdjustmentOptional Tailwheel Adjustment Attaching Cutter to TractorBlade Selection General MowingCutter Head Hydraulic Lift Tractor and Cutter OperationTransport Brush and Ditch Bank MowingOwner Service Owner ServiceLubrication Slip Clutch Adjustment Blade InstallationBlade Servicing Blade RemovalChain Shielding Repair CleaningAfter Each Use Periodically or Before Extended StorageTrouble Shooting Trouble ShootingDealer Service Dealer ServiceGearbox Maintenance Seal InstallationCrossbar Shimming InstallationDealer Service Universal Joint Repair Joint DisassemblyJoint Assembly SPOOL, 3-WAY Valve SPRING-LOADED Wheel Yoke AdjustmentOpen-Center or Closed-Center OperationDealer Check Lists Dealer Check ListPRE-DELIVERY Check List Delivery CheckAssembly AssemblyDrive Shaft Installation DP1Lift Link Installation Lift Cylinder InstallationMounting A-Frame on Center Frame Attaching Cutter Head to Center FrameSide Drive Installation Figure Side Shield InstallationCutter Head Gearbox Shield Installation Chain Shielding Installation Tire and Skid Assembly InstallationCheck Chain Installation Counterweight Installation OptionalControl Valve Installation Optional Tailwheel OptionalStump Jumper Optional Assembly Parts Parts IndexCenter Section Assembly Hardware Cutter Head Section Assembly Early S106-3 Tubular Side Drive Assembly Cutter Head Gearbox Assembly Input Gearbox Assembly Standard Drive Front Half of 2-JOINT Drive 35RSlip Clutch Assembly Joint Shielding Plastic Used on Later Machines Integral U-JOINT Shielding Used on Earlier MachinesPart QTY Description 2 Bore & 8 Stroke Hydraulic CylinderPiston SPOOL, 3-WAY Valve Optional Pneumatic Tailwheel Assembly HUB Assembly for Pneumatic Tailwheel Pneumatic Tire Assembly for TailwheelTailwheel Assembly Tailwheel & Gauge Wheel Assembly Gauge Wheel & Tailwheel HUB & Axle AssemblyStandard 1 Shaft Heavy-Duty 1-1/4 Shaft Stump Jumper Optional Crossbar Puller AssemblySAE Series Torque Chart Bolt Torque ChartAppendix Metric SeriesAbbreviations Bolt Size ChartIndex IndexWarranty South Illinois Route Post Office Box Oregon, Illinois