Yazoo/Kees ZEKH42200, ZEKH48240, ZEKH52240 manual Running

Page 32

OPERATION

Running

1.Release the parking brake by moving the lever forward.

Your mower is equipped with an operator presence system. When the engine is running, any attempt by the operator to leave the seat without first setting the parking brake will shut off the engine.

2.Move the steering controls to the neutral position (N).

3.Select the cutting height by adjusting the cutting height pin. Release latch and lower deck to set cutting height. Make sure the tire pressure on both front tires is 15 PSI/103 kPa.

4.Make sure the work area and blades are free from objects that could be thrown by the blades.

IMPORTANT INFORMATION

The mower deck’s anti-scalp rollers should be evenly adjusted.

WARNING!

Ensure that no one is near the machine when engaging the Blade switch.

5.Engage the mower deck by pulling out the blade switch.

6.Move throttle control to full throttle.

7.The machine’s speed and direction are continuously variable using the two steering controls. When both controls are in the neutral position, the machine stands still.

By moving both controls an equal amount forward or backward, the machine moves in a straight line forward or backward respectively.

8011-711

Released parking brake

Cutting height selection

8011-669

Engaging the mower deck

English-30

Image 32
Contents Operator’s manual Page Contents OPERATOR’S Manual ZE RiderEnglish-2 Introduction IntroductionGood Service Manufacturing NumberXxxx xxxxxx Symbols and DecalsSymbols and Decals Repair work General Operation Safety InstructionsSafety Instructions English-8 Personal Safety Equipment Slope OperationChildren Maintenance General Maintenance Risk of sparking Transport Important InformationCustomer responsibilities Controls ControlsMotion Control Levers Seat adjustment bolts Parking BrakeTracking Fuel Shut Off ValveRefueling By pass linkage FusesChoke Control Ignition SwitchHour Meter Throttle Control Blade switchUSE Full Throttle When Mowing , for Accessories Cutting height pedalTraining OperationOperation Before Starting Starting the EngineDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To start an engine with a weak battery To remove cables, reverse orderRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance Schedule MaintenanceMaintenance Nance Once Each Maintenance Before After 100 Battery To clean battery and terminalsReplacing battery Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking the Engines Cooling Air Intake Checking and Adjusting the Throttle CableChecking and Adjusting the Choke Cable Standard air filter ServiceReplacing the Air Filter Checking Tire Pressures Replacing the Fuel FilterChecking the Fuel Pump’s Air Filter Checking the Parking Brake Checking the V-beltsDeck belt To replace deck beltDeck belt installation IZT belt IZT belt removalBelt installation Checking the BladesRemove blade bolt by turning counterclockwise Leveling Adjusting the Mower DeckAdjusting Cutting Height To adjust anti-scalp rollers Cleaning and Washing Use protective glasses when cleaning and washingRemoval and installation of caster wheel Caster WheelsTracking adjustment To adjust parking brakeMower is tracking to the right Mower is tracking to the leftLubrication LubricationLubrication Schedule Change transaxles transmission filtersLubricating the Cables Lubricating in Accordance with the Lubrication ScheduleFront Wheel Mount Front Wheel BearingsDeck outer spindle Engine Oil Changing the Engine OilChecking the Oil Level Changing the Engine Oil Filter Transaxle Transmission Fluid ChangeExpansion Tank Purging Procedures Problem Cause Trouble Shooting GuideTrouble Shooting Guide English-60 English-61 Service StorageStorage Winter StorageWiring Diagrams Wiring diagramZEKH42200/968999694 ZEKH48240/968999698 Technical DataTechnical Data Productivity ZEKH52240/968999701 625 lbs Torque Specifications USA requirements Conformity CertificatesConformity Certificates Service Journal Service JournalDelivery Service Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service ActionEnglish-73 English-74 English-75 English-76 Page 530 131340IR 07/31/07