Yazoo/Kees ZEKH48240 Service Journal, Delivery Service, Action Date, mtr reading, stamp, sign

Page 72

SERVICE JOURNAL

Service Journal

Action

Date, mtr reading, stamp, sign

Delivery Service

 

1.

Charge the battery.

 

2.

Adjust the tire pressure of all wheels to 15 PSI (1 bar).

 

3.

Mount the steering controls in the normal position.

 

4.

Connect the contact box to the cable for the seat’s

 

 

safety switch.

 

5.

Check that the right amount of oil is in the engine.

 

6.

Adjust the position of the steering controls.

 

7.

Fill with fuel and open the fuel shut of valve.

 

8.

Start the engine.

 

9.

Check that there is drive to both wheels.

 

10.

Check the mower deck adjustment.

 

11.

Check:

 

 

The safety switch for the parking brake.

 

 

The safety switch for the mower deck.

 

 

The safety switch in the seat.

 

 

The safety switch in the steering controls.

 

 

Parking brake functionality.

 

 

Driving forward.

 

 

Driving backward.

 

 

Engaging the blades.

 

12.

Check the idle speed

 

13.

Check the engine high idle speed

 

14.

Inform the customer about:

Delivery service has been carried

 

The need and advantages of following the service schedule.

out.

 

 

 

The need and advantages of leaving the machine

No remaining notes.

 

 

 

for service every 300 hours.

Certified:

 

The effects of service and maintaining a service journal on

 

 

the machine’s resale value.

 

 

Application areas for Mulching.

 

15.Fill in the sales papers, etc.

 

English-70

Image 72
Contents Operator’s manual Page Contents OPERATOR’S Manual ZE RiderEnglish-2 Introduction IntroductionGood Service Manufacturing NumberSymbols and Decals Symbols and DecalsXxxx xxxxxx Repair work Safety Instructions Safety InstructionsGeneral Operation English-8 Personal Safety Equipment Slope OperationChildren Maintenance General Maintenance Risk of sparking Transport Important InformationCustomer responsibilities Controls ControlsMotion Control Levers Seat adjustment bolts Parking BrakeTracking Fuel Shut Off ValveRefueling By pass linkage FusesIgnition Switch Hour MeterChoke Control Blade switch USE Full Throttle When Mowing , forThrottle Control Accessories Cutting height pedalOperation OperationTraining Before Starting Starting the EngineDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To start an engine with a weak battery To remove cables, reverse orderRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance MaintenanceMaintenance Schedule Nance Once Each Maintenance Before After 100 Battery To clean battery and terminalsReplacing battery Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting the Throttle Cable Checking and Adjusting the Choke CableChecking the Engines Cooling Air Intake Service Replacing the Air FilterStandard air filter Replacing the Fuel Filter Checking the Fuel Pump’s Air FilterChecking Tire Pressures Checking the Parking Brake Checking the V-beltsDeck belt To replace deck beltDeck belt installation IZT belt IZT belt removalBelt installation Checking the BladesRemove blade bolt by turning counterclockwise Adjusting the Mower Deck Adjusting Cutting HeightLeveling To adjust anti-scalp rollers Cleaning and Washing Use protective glasses when cleaning and washingRemoval and installation of caster wheel Caster WheelsTracking adjustment To adjust parking brakeMower is tracking to the right Mower is tracking to the leftLubrication LubricationLubrication Schedule Change transaxles transmission filtersLubricating the Cables Lubricating in Accordance with the Lubrication ScheduleFront Wheel Mount Front Wheel BearingsDeck outer spindle Engine Oil Changing the Engine OilChecking the Oil Level Changing the Engine Oil Filter Transaxle Transmission Fluid ChangeExpansion Tank Purging Procedures Trouble Shooting Guide Trouble Shooting GuideProblem Cause English-60 English-61 Service StorageStorage Winter StorageWiring Diagrams Wiring diagramTechnical Data Technical DataZEKH42200/968999694 ZEKH48240/968999698 Productivity ZEKH52240/968999701 625 lbs Torque Specifications Conformity Certificates Conformity CertificatesUSA requirements Service Journal Service JournalDelivery Service Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service ActionEnglish-73 English-74 English-75 English-76 Page 530 131340IR 07/31/07