Yazoo/Kees ZEKH48240, ZEKH52240, ZEKH42200 manual Operating on hills

Page 33

OPERATION

In order, for example, to turn right while moving forward, move the right control towards the neutral position. The rotation of the right wheel is reduced and the machine turns to the right.

Turning on the spot can be achieved by moving one control backward (behind the neutral position) and carefully moving the other steering control forward from its neutral position.

Operating on hills

Read the “Slope Operation” in the “Safety Instruction” section.

WARNING!

To prevent the machine from rolling over never drive the machine on ground with a slope of more than 10 degrees. Mow slopes upwards and downwards, never across. Avoid sudden changes in direction.

The slowest speed possible should be used before starting up or down hills.

Avoid stopping or changing speed on hills.

If stopping is absolutely necessary, pull drive levers into the neutral position and push to the outside of the unit and engage the park brake.

IMPORTANT INFORMATION

Control levers return to neutral when released. This may cause the mower to suddenly stop.

To restart movement, release the park brake.

Pull the control levers back to the center of the mower and press forward to regain forward motion.

Make all turns slowly.

10

10 degrees

8011-772

Stopping conditions

8011-711

Released parking brake

English-31

Image 33
Contents Operator’s manual Page OPERATOR’S Manual ZE Rider ContentsEnglish-2 Introduction IntroductionManufacturing Number Good ServiceSymbols and Decals Symbols and DecalsXxxx xxxxxx Repair work Safety Instructions Safety InstructionsGeneral Operation English-8 Slope Operation Personal Safety EquipmentChildren Maintenance General Maintenance Risk of sparking Important Information TransportCustomer responsibilities Controls ControlsMotion Control Levers Parking Brake Seat adjustment boltsTracking Fuel Shut Off ValveRefueling Fuses By pass linkageIgnition Switch Hour MeterChoke Control Blade switch USE Full Throttle When Mowing , forThrottle Control Cutting height pedal AccessoriesOperation OperationTraining Starting the Engine Before StartingDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To remove cables, reverse order To start an engine with a weak batteryRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance MaintenanceMaintenance Schedule Nance Once Each Maintenance Before After 100 To clean battery and terminals BatteryReplacing battery Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting the Throttle Cable Checking and Adjusting the Choke CableChecking the Engines Cooling Air Intake Service Replacing the Air FilterStandard air filter Replacing the Fuel Filter Checking the Fuel Pump’s Air FilterChecking Tire Pressures Checking the V-belts Checking the Parking BrakeDeck belt To replace deck beltDeck belt installation IZT belt removal IZT beltChecking the Blades Belt installationRemove blade bolt by turning counterclockwise Adjusting the Mower Deck Adjusting Cutting HeightLeveling To adjust anti-scalp rollers Use protective glasses when cleaning and washing Cleaning and WashingRemoval and installation of caster wheel Caster WheelsTo adjust parking brake Tracking adjustmentMower is tracking to the right Mower is tracking to the leftLubrication LubricationLubrication Schedule Change transaxles transmission filtersLubricating in Accordance with the Lubrication Schedule Lubricating the CablesFront Wheel Mount Front Wheel BearingsEngine Oil Changing the Engine Oil Deck outer spindleChecking the Oil Level Transaxle Transmission Fluid Change Changing the Engine Oil FilterExpansion Tank Purging Procedures Trouble Shooting Guide Trouble Shooting GuideProblem Cause English-60 English-61 Storage ServiceStorage Winter StorageWiring diagram Wiring DiagramsTechnical Data Technical DataZEKH42200/968999694 ZEKH48240/968999698 Productivity ZEKH52240/968999701 625 lbs Torque Specifications Conformity Certificates Conformity CertificatesUSA requirements Service Journal Service JournalDelivery Service Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Action Hour ServiceEnglish-73 English-74 English-75 English-76 Page 530 131340IR 07/31/07