ASSEMBLY
ASSEMBLY
TOP LINK ATTACHMENT
1.Fit the machines top link.(Figure
2.Raise machine on tractors linkage until the tractor PTO and the machines gearbox stub shaft are approxi- mately in line. (Figure
NOTE: As lift occurs be aware the machinery may tilt slightly.
The quadrant lever or machine controls must be operated from the tractor seat. During this operation ensure no one is standing on or between the linkage arm or bars.
3.Adjust the top link to bring the machines frame vertical. (Figure
4.Refit the top link nose quadrant pin, fine adjust position using the tractors draft lift.(A) (Figure
5.Lower tractor linkage control so that machines weight is taken by the yoke.
6.Fully tighten the stabilizer lower bolts.(C)
RMB 1445 11/10 | Assembly Section |
© 2010 Alamo Group Inc.