Bush Hog RMB 1445 manual Transporting on Public Roadways

Page 94
(SG-6)
(SG-10)
(STI-06)

OPERATION

OPERATION

Before transporting the tractor on a public roadway or boarding a trailer for transport, the tractor brake pedals should be locked together. Locking the pedals ensures that both wheels brake simultaneously while stopping, especially when making an emergency stop.

Use extreme caution and avoid hard applications of the tractor brakes when towing heavy loads at road speeds. Never tow the implement at speeds greater than 20 MPH (32 kph). OPS-U- 0018

13.1 Transporting on Public Roadways

Extreme caution should be used when transporting the tractor and implement on public roadways. The tractor must be equipped with all required safety warning features including a SMV emblem and flashing warning lights to alert drivers of the tractor’s presence. Remember that roadways are primarily designed for automotive drivers and most drivers will not be looking out for you, therefore, you must look out for them. Check your side view mirrors frequently and remember that vehicles will approach quickly because of the tractor’s slower speed. Be extremely cautious when the piece of equipment that you are towing is wider than the tractor tire width and/or extends beyond your lane of the road.

Make sure that a proper size safety tow chain is secured between the tractor and implement before entering a public road. OPS-U- 0019

NOTE: Ensure that the mower sections are fully raised and that the transport locks are engaged for each section.

Only tow the Implement behind a properly sized and equipped Tractor which exceeds the weight of the Implement by at least 20%. DO NOT tow the Implement behind a truck or other type of vehicle. Never tow the Implement and another Implement connected in tandem. Never tow the Implement at speeds over 20 MPH.

Never allow children or other persons to ride on the Tractor or Implement.

Falling off can result in serious injury or death.

Make certain that the “Slow Moving Vehicle” (SMV) sign is installed in such a way as to be clearly visible and legible. When transporting the Equipment use the Tractor flashing warning lights and follow all local traffic regulations.

RMB 1445 11/10

Operation Section 4-40

© 2010 Alamo Group Inc.

Image 94
Contents RMB Warranty Information To the Owner/Operator/DealerPage Alamo Group Ag. Division is willing to provide Table of Contents Maintenance Section Hydraulic Hoses Page Safety Section Safety Operator Safety Instructions and Practices SG-36 Wait a minute...Save a life Equipment Operation Safety Instructions and Practices Safety Stop Mowing if Passersby are Within 300 Feet Unless Safety SGM-06 SGM-08 Maintenance and Service Safety Instructions and Practices Safety Transporting Safety Instructions and Practices Parts InformationSafety Concluding Safety Instructions and Practices Decal Location Logo NFS Serial PlateName BookletInstruct NFS SER PLTMULTI-DECAL Decal Description Safety Safety Safety Safety Safety Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Installing the Operator Guard Cab Tractor Tractor PreparationBallast Factors that affect stabilityDealer Setup Instructions Stabilizer AttachmentTOP Link Attachment Driveline Attachment Remove Transport Strap Hose RoutingTank Final Assembly ChecksOIL Requirements ISO VG SAEFitting Control Unit in CAB GearboxRemoval from Tractor Running UP ProcedureRMB 1445/1660/1865 With Flail Head only Page Operation Section Operation Operation Operator Requirements Personal Protective Equipment PPERops and Seat Belt Tractor RequirementsOperator Thrown Object Protection Tractor Lighting and SMV Emblem Tractor BallastFront End Weight Tractor Safety DevicesTractor Horsepower 3-Point HitchPower Take Off PTO Getting on and OFF the TractorBoarding the Tractor Dismounting the TractorStarting the Tractor PRE-OPERATION Inspection and Service Tractor Pre-Operation Inspection/Service Boom Unit Pre-Operation Inspection and Service Boom ARM Assembly Frame AssemblyHydraulic Line Inspection Hydraulic PUMP/OIL Reservoir Flail Head Inspection Sickle BAR Inspection Do not Operate an Unsafe Tractor or Implement Do not Operate an Unsafe Tractor or Mower Machine Controls Rotor Controls Reversing Rotation With FlailheadEngaging Drive Angle FloatRotor Operating Speed Operating Speed Forward SpeedTractor Position Parallel Motion GeometryBreakaway Action High Voltage CablesCutting Sequence Grass Cutting Driving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Operating the Tractor and Implement Driving the Tractor and BoomOperating Instructions RMB 1445 11/10 Operation Section Bystanders/Passersby Precautions Foreign Debris HazardsEngaging the Power Take Off PTO Operating Speed and Ground Speed Operating the MowerSGM-08 Grass Flail Operating the Attached Mower HeadsSickle Bar TRACTOR, BOOM, and Attached Head Storage Shutting Down the Attached HeadTransporting the Tractor and Implement Transporting on Public Roadways Operation Hauling the Tractor and Implement Operation Troubleshooting Guide Trouble Possible Cause Possible RemedyOperation Operation Maintenance Section Maintenance LubricationPTO Shaft PTO LubricationCutting PTO Shaft Maintenance Hydraulic System Filtration MaintenanceHose Replacement Hydraulic HosesHose Warranty PTO GearboxFlailhead CablesProper Torque Values for Fasteners Hose ConnectionsMain Control Valve Maintenance Page Limited Warranty Required of the Owner Required of the OperatorRMB 1445 Rear Mount Boom Mower