Bush Hog RMB 1445 manual Running UP Procedure, Removal from Tractor

Page 53

ASSEMBLY

RUNNING UP PROCEDURE

RMB 1445/1660/1865 - With Flail Head ONLY

1.Ensure that the rotor control is in “STOP” position, start the tractor, engage PTO and allow the oil to circulate for about 5 minutes before operating the arms.

2.Operate the armhead levers through their complete range ensuring that all movements are functioning correctly.

3.Check that the flail nuts and bolts are tight. Place the flail head at a safe position and move the rotor control to “ON” position. After initial fluctuation due to priming, the rotor should settle to a steady speed. Increase PTO speed to approximately 360 RPM and run for a further five minutes before engaging and stopping tractor.

4.Check the hose routing and observe that they are free from any pinching, chafing, straining or kinks. Recheck the oil level in the tank and top up as necessary.

Do not allow the pump to continue working if the rotor does not turn. Overheating and serious pump damage to the pump can be caused in a very short time.

5. Replace return filter elements after an initial 12 hours of operation and every 500 hours thereafter.

All models:

Replace return filter elements after an initial 12 hours of operation and every 500 hours thereafter.

REMOVAL FROM TRACTOR

1.Select a firm level site for parking the machine.

2.Lower the stand legs and lock.

3.Raise the machine until the weight is taken off the stabilizer.

4.Remove the stabilizer nose quadrant locking pin.

5.Lower the machine to the ground.

6.Operate machine controls and place the flail head on the ground.

7.Disengage tractor PTO and remove the drive shaft.

8.Disconnect stabilizers bars or loosen check chains as applicable.

9.Unbolt the control unit from the mounting bracket, remove from tractor cab and stow the lever in a suitable location clear of the ground.

10.Raise the machine on the tractor’s linkage to take the weight off the yoke and remove the lower yoke pins.

11.Lower the tractor draft links and place machine firmly on the ground.

12.Remove draft links and top link from the machine, drive tractor away and remove yoke.

RMB 1445 11/10

Assembly Section 3-11

© 2010 Alamo Group Inc.

ASSEMBLY

Image 53
Contents RMB To the Owner/Operator/Dealer Warranty InformationPage Alamo Group Ag. Division is willing to provide Table of Contents Maintenance Section Hydraulic Hoses Page Safety Section Safety Operator Safety Instructions and Practices SG-36 Wait a minute...Save a life Equipment Operation Safety Instructions and Practices Safety Stop Mowing if Passersby are Within 300 Feet Unless Safety SGM-06 SGM-08 Maintenance and Service Safety Instructions and Practices Safety Parts Information Transporting Safety Instructions and PracticesSafety Concluding Safety Instructions and Practices Decal Location Name NFS Serial PlateLogo BookletNFS SER PLT InstructMULTI-DECAL Decal Description Safety Safety Safety Safety Safety Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Tractor Preparation Installing the Operator Guard Cab TractorFactors that affect stability BallastStabilizer Attachment Dealer Setup InstructionsTOP Link Attachment Driveline Attachment Hose Routing Remove Transport StrapOIL Requirements Final Assembly ChecksTank ISO VG SAEGearbox Fitting Control Unit in CABRMB 1445/1660/1865 With Flail Head only Running UP ProcedureRemoval from Tractor Page Operation Section Operation Operation Personal Protective Equipment PPE Operator RequirementsOperator Thrown Object Protection Tractor RequirementsRops and Seat Belt Tractor Ballast Tractor Lighting and SMV EmblemTractor Horsepower Tractor Safety DevicesFront End Weight 3-Point HitchGetting on and OFF the Tractor Power Take Off PTODismounting the Tractor Boarding the TractorStarting the Tractor PRE-OPERATION Inspection and Service Tractor Pre-Operation Inspection/Service Boom Unit Pre-Operation Inspection and Service Hydraulic Line Inspection Frame AssemblyBoom ARM Assembly Hydraulic PUMP/OIL Reservoir Flail Head Inspection Sickle BAR Inspection Do not Operate an Unsafe Tractor or Implement Do not Operate an Unsafe Tractor or Mower Machine Controls Reversing Rotation With Flailhead Rotor ControlsRotor Operating Speed Angle FloatEngaging Drive Tractor Position Forward SpeedOperating Speed Parallel Motion GeometryHigh Voltage Cables Breakaway ActionCutting Sequence Grass Cutting Driving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Driving the Tractor and Boom Operating the Tractor and ImplementOperating Instructions RMB 1445 11/10 Operation Section Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower Operating Speed and Ground SpeedSGM-08 Sickle Bar Operating the Attached Mower HeadsGrass Flail Shutting Down the Attached Head TRACTOR, BOOM, and Attached Head StorageTransporting the Tractor and Implement Transporting on Public Roadways Operation Hauling the Tractor and Implement Operation Trouble Possible Cause Possible Remedy Troubleshooting GuideOperation Operation Maintenance Section Lubrication MaintenancePTO Lubrication PTO ShaftCutting PTO Shaft Maintenance Hose Replacement Filtration MaintenanceHydraulic System Hydraulic HosesPTO Gearbox Hose WarrantyCables FlailheadMain Control Valve Hose ConnectionsProper Torque Values for Fasteners Maintenance Page Limited Warranty Required of the Operator Required of the OwnerRMB 1445 Rear Mount Boom Mower