The Switch 4210G (excluding Switch 4210G NT 24-Port and Switch 4210G NT 48-Port) support IRF. For details about implementation of the IRF system and installation procedures, refer to Installation Flow for an IRF.

Installing the Switch into a 19-Inch Rack Using Mounting Brackets

The installation methods of a switch depend on the depth and width of the switch. For the specific installation methods, see Table 3-1.

Table 3-1Installation methods for the Switch 4210G

 

 

 

Method

 

 

 

Use front

 

 

Use front mounting

 

 

Use front and rear

 

 

 

 

 

 

 

 

mounting

 

 

 

 

 

 

 

 

Model

 

 

 

 

 

 

brackets and a tray

 

 

mounting brackets

 

 

 

 

 

 

 

 

brackets

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch 4210G 24-Port

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch 4210G

48-Port

 

 

 

 

 

 

 

 

Switch 4210G

NT 24-Port

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch 4210G

NT 48-Port

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Switch 4210G PWR 24-Port

 

 

 

 

 

 

 

 

Switch 4210G PWR 48-Port

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

When the depth of a switch is greater than 300 mm (11.81 in.), the front mounting brackets only secure the switch rather than bear its weight.

Introduction to Mounting Bracket

Figure 3-2Appearance of a standard front mounting bracket

(1)(2)

(1)Screw hole used to fix the mounting bracket to the cabinet (Use one M6 screw)

(2)Screw hole used to fix the switch to the mounting bracket

3-2

Page 31
Image 31
3Com 4210G manual Introduction to Mounting Bracket