Installation Flow for an IRF

Figure 3-24Installation flow for an IRF

Table 3-4Description of the installation flow for an IRF of switches

No

 

 

Task

 

 

Remarks

 

 

 

 

 

Take the following into consideration:

 

 

 

Draw a plan for

 

z Number of IRF members and the bandwidth

 

 

 

 

z

Interface modules and cables

1

 

 

an IRF with

 

 

 

 

z

Physical connection mode( daisy chain connection or ring connection)

 

 

 

switches

 

 

 

 

 

z

Cable connection

 

 

 

 

 

 

 

 

 

 

For details, see Drawing a Plan for an IRF with Switches.

 

 

 

 

 

 

 

 

 

Install the IRF

 

For detailed installation procedures, see:

2

 

 

members to the

 

z

Installing the Switch into a 19-Inch Rack Using Mounting Brackets.

 

 

 

correct position

 

z

Mounting the Switch on a Workbench.

 

 

 

 

 

 

 

 

Connect

 

For details, see:

3

 

 

grounding

 

 

 

cables and

 

z

Connecting the Grounding Cable

 

 

 

power cords for

 

z

Connecting the Power Cords

 

 

 

the switches

 

 

 

 

 

 

 

 

 

 

 

 

 