| IBM Protocols and Services Notes 47 |
| fails to add scroll bars with text fields. If you experience this or other problems, |
| you may want to use a later version of Netscape when it becomes available. |
Upgrade Link Window | Since Enterprise OS software version 11.4 Upgrade Link cannot resize the browser |
Resizing | window, you should maximize the browser window so that all of the Upgrade Link |
| dialog boxes are fully visible without scrolling. |
|
|
IBM Protocols and | This section describes notes, cautions, and other considerations to be aware of |
Services Notes | when using the Enterprise OS software when with IBM protocols and services. The |
| topics are presented in alphabetical order. |
APPN | In software version 11.4, APPN does not support SMDS. |
APPN Connections to | When you connect to a 3174 on a token ring, you may need to enable transparent |
3174 through | bridging on the bridge/router. The 3174 may send exchange identification (XID) as |
Token Ring | a |
APPN | If you set up APPN routing in an SNA Boundary Routing configuration from a |
and SNA Boundary | NETBuilder II bridge/router to a leaf node bridge/router, |
Routing | the remote site PC and the NETBuilder II bridge/router are established before you |
| can configure the Boundary Routing configuration on the NETBuilder II |
| bridge/router. However, after you set the |
| and enable the |
| |
| NETBuilder II port at the central site. An alternative work around is to configure |
| APPN with DLSw at the central site and to use the CEC’s MAC address at the |
| remote site. |
APPN | When parallel transmission groups (TGs) are configured between 3Com network |
Parallel TGs | nodes and both TGs support |
| switch to the other TG if the user disables the port or path. This happens because |
| both sides learn about the link failure at different times. The network node with |
| the disabled port or path learns about the link failure right away and tries to bring |
| |
| not learn about the link failure until LLC2 times out; because it thinks the link is |
| still up, the second network node does not allow |
| second TG. After five attempts at bringing up |
| the second TG will be flagged as not supporting |
| sessions from coming up on that second TG. To prevent this situation, manually |
| stop the first TG by entering the SET |
| Deactivate command before disabling the port/path. By doing this, both network |
| nodes will learn that the link has gone down at the same time, and |
| can be activated on the second TG. |
APPN DLUr Connections | When you configure an APPN dependent LU requestor (DLUr) connection from a |
to 3174 Systems | NETBuilder II bridge/router to a 3174 cluster controller, the NETBuilder II network |
| node and the 3174 must be on the same ring. In this configuration, the |
| NETBuilder II token ring port must be set to transparent bridging only. |
BSC and Leased Lines | The BSC |